| Assessment Year | 2012 |
|---|---|
| Principal Product | Motor vehicle component |
| NAICS | 332618: Other Fabricated Wire Product Manufacturing |
| SIC | 3496: Miscellaneous Fabricated Wire Products |
| Sales Range | $10 M to 50M |
| # of Employees | 131 |
| Plant Area |
103,900
ft2
|
| Annual Production | 5,800,000
lb
|
| Production Hrs. Annual | 8,520
hrs
|
| Location (State) | Wisconsin |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $249,393 | 3,871,600 |
kWh
|
$0.064 |
| Electricity Demand | $88,152 | 7,764 |
kW-mo/yr
|
$11.35 |
| Natural Gas | $19,945 | 2,316 |
MMBtu
|
$8.61 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $60,759 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $28,384 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings | By-product Production Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7221: Lower temperature during the winter season and vice-versa | $444 | - |
$386
5,982
kWh
|
$59
-
kW-mo/yr
|
- | - | - | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,581 | $488 |
$2,888
43,500
kWh
|
$693
-
kW-mo/yr
|
- | - | - | - | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,926 | - |
$7,155
111,101
kWh
|
$1,771
-
kW-mo/yr
|
- | - | - | - | |
| 04 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $22,037 | - |
$21,617
335,676
kWh
|
$420
-
kW-mo/yr
|
- | - | - | - | |
| 05 | 2.6127: Maintain air filters by cleaning or replacement | $1,994 | $191 | - | - | - |
$1,994
-
MMBtu
|
- | - | |
| 06 | 2.6212: Turn off equipment during breaks, reduce operating time | $772 | - |
$772
11,871
kWh
|
- | - | - | - | - | |
| 07 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $341 | - | - | - | $341 | - | - | - | |
| 08 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $15,810 | - | - | - | - | - | $15,810 | - | |
| 09 | 4.424: Improve space comfort conditioning | $6,854 | $884 | - | - | - | - | - | $6,854 | |
| TOTAL RECOMMENDED | $60,759 | $1,563 |
$32,818
508,130
kWh
|
$2,943
-
kW-mo/yr
|
$341 |
$1,994
-
MMBtu
|
$15,810 | $6,854 | ||
| TOTAL IMPLEMENTED | $28,384 | $679 |
$25,277
391,047
kWh
|
$1,113
-
kW-mo/yr
|
- |
$1,994
-
MMBtu
|
- | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings | By-product Production Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs