Assessment Year | 2002 |
---|---|
Principal Product | Offset Magazine Printing |
NAICS |
n/a
|
SIC | 2752: Commercial Printing, Lithographic |
Sales Range | $50 M to 100M |
# of Employees | 560 |
Plant Area |
520,000
ft2
|
Annual Production | 7,000,000
ton
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,256,677 | 28,682,687 |
kWh
|
$0.044 |
Electricity Demand | $217,627 | 58,189 |
kW-mo/yr
|
$3.74 |
Electricity Fees | $853,626 | - |
|
- |
Natural Gas | $380,268 | 79,739 |
MMBtu
|
$4.77 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $972,474 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,028 | $35,111 | n/a |
$8,715
150,261
kWh
|
$771
-
kW-mo/yr
|
- | - | $1,542 |
02 | 2.7111: Reduce illumination to minimum necessary levels | $20,052 | $165 | n/a |
$17,027
293,565
kWh
|
$1,761
-
kW-mo/yr
|
$217 | - | $1,047 |
03 | 2.7111: Reduce illumination to minimum necessary levels | $2,430 | $1,980 | n/a |
$1,649
28,437
kWh
|
$524
-
kW-mo/yr
|
- | - | $257 |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $14,479 | $2,000 | n/a |
$13,039
224,803
kWh
|
$1,440
-
kW-mo/yr
|
- | - | - |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $19,557 | $8,250 | n/a |
$13,566
223,892
kWh
|
$5,991
-
kW-mo/yr
|
- | - | - |
06 | 2.6218: Turn off equipment when not in use | $3,479 | $7,150 | n/a |
$3,153
54,363
kWh
|
$326
-
kW-mo/yr
|
- | - | - |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $18,070 | $4,100 | n/a |
$16,602
286,229
kWh
|
$1,468
-
kW-mo/yr
|
- | - | - |
08 | 2.6218: Turn off equipment when not in use | $7,379 | $11,000 | n/a |
$6,688
115,315
kWh
|
$691
-
kW-mo/yr
|
- | - | - |
09 | 4.514: Re-arrange equipment layout to reduce handling costs | $876,000 | $690,000 | n/a | - | - | - | $876,000 | - |
TOTAL RECOMMENDED | $972,474 | $759,756 |
$80,439
1,376,865
kWh
|
$12,972
-
kW-mo/yr
|
$217 | $876,000 | $2,846 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs