Assessment Year | 2000 |
---|---|
Principal Product | personal hygiene products |
NAICS |
n/a
|
SIC | 2834: Pharmaceutical Preparations |
Sales Range | $10 M to 50M |
# of Employees | 435 |
Plant Area |
650,000
ft2
|
Annual Production | 25,000
ton
|
Production Hrs. Annual | 7,200
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $126,435 | 5,186,987 |
kWh
|
$0.024 |
Electricity Demand | $91,155 | 9,659 |
kW-mo/yr
|
$9.44 |
Electricity Fees | $1,920 | - |
|
- |
Natural Gas | $173,005 | 47,687 |
MMBtu
|
$3.63 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $400,474 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $129,234 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.2121: Increase amount of condensate returned | $36,908 | $85,000 | - | - |
$29,150
-
MMBtu
|
$7,758
-
Tgal
|
- | - | - | |
02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $12,800 | $40,000 |
$7,027
288,101
kWh
|
$10,195
-
kW-mo/yr
|
$(-4,422.0)
-
MMBtu
|
- | - | - | - | |
03 | 2.2427: Use waste heat from hot flue gases to preheat incoming fluids | $9,331 | $20,000 | - | - |
$9,331
-
MMBtu
|
- | - | - | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,867 | $200 |
$3,567
146,249
kWh
|
$2,300
-
kW-mo/yr
|
- | - | - | - | - | |
05 | 2.4131: Size electric motors for peak operating efficiency | $4,167 | $10,200 |
$1,467
60,082
kWh
|
$2,700
-
kW-mo/yr
|
- | - | - | - | - | |
06 | 2.4239: Eliminate or reduce compressed air usage | $2,692 | $1,500 |
$2,692
110,492
kWh
|
- | - | - | - | - | - | |
07 | 2.7145: Install skylights | $70,269 | $5,536 | - |
$1,269
-
kW-mo/yr
|
- | - | - | - | $69,000 | |
08 | 3.5316: Contract a wood pallet recycling company | $2,240 | $30,000 | - | - | - | - | - | $2,240 | - | |
09 | 4.112: Replace old machine with new automatic multi-station tool | $256,200 | $100,000 | - | - | - | - | $256,200 | - | - | |
TOTAL RECOMMENDED | $400,474 | $292,436 |
$14,753
604,924
kWh
|
$16,464
-
kW-mo/yr
|
$34,059
-
MMBtu
|
$7,758
-
Tgal
|
$256,200 | $2,240 | $69,000 | ||
TOTAL IMPLEMENTED | $129,234 | $122,436 |
$7,726
316,823
kWh
|
$6,269
-
kW-mo/yr
|
$38,481
-
MMBtu
|
$7,758
-
Tgal
|
- | - | $69,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs