ITAC Assessment: OR0590
ITAC logo
ITAC Assessment: OR0590
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Wood Windows and Doors
NAICS 321911: Wood Window and Door Manufacturing
SIC 2431: Millwork
Sales Range $50
M
to 100
M
# of Employees 275
Plant Area 317,000
ft2
Annual Production 65,000
pieces
Production Hrs. Annual 3,328
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $291,898 5,604,052
kWh
Electricity Demand $124,323 19,398
kW-mo/yr
Electricity Fees $35,517 -
Natural Gas $62,384 13,315
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,279 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,137

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4131: Size electric motors for peak operating efficiency $5,954 $5,038 $4,016
74,608
kWh
$1,938
-
kW-mo/yr
- - -
02 2.2211: Use optimum temperature $3,137 - - - $3,137
-
MMBtu
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $18,188 $87,787 $13,627
249,128
kWh
$4,719
-
kW-mo/yr
- $(-506.0) $348
TOTAL RECOMMENDED $27,279 $92,825 $17,643
323,736
kWh
$6,657
-
kW-mo/yr
$3,137
-
MMBtu
$(-506.0) $348
TOTAL IMPLEMENTED $3,137 - - - $3,137
-
MMBtu
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs