ITAC Assessment: OR0373
ITAC logo
ITAC Assessment: OR0373
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Amino Acids
NAICS
n/a
SIC 2833: Medicinal Chemicals and Botanical Products
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 65,340
ft2
Annual Production 0
lb
Production Hrs. Annual 1,560
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $9,509 267,000
kWh
Electricity Demand $950 300
kW-mo/yr
Electricity Fees $950 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $264,696 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,477

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Other Liquid (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $9,100 - - - - - - - $9,100 -
02 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $262 - $181
5,275
kWh
- - - $25 - - $56
03 2.6212: Turn off equipment during breaks, reduce operating time $2,186 $630 $2,186
63,600
kWh
- - - - - - -
04 2.4133: Use most efficient type of electric motors $6,115 $11,205 $5,165
150,350
kWh
$950
-
kW-mo/yr
- - - - - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,083 $6,300 $2,083
50,700
kWh
- - - - - - -
06 2.3212: Optimize plant power factor $950 $2,700 - - $950 - - - - -
07 3.8142: Distill contaminated solvents for reuse $244,000 $110,000 - - - $39,310
-
gal
- $(-22,900.0) - $227,590
TOTAL RECOMMENDED $264,696 $130,835 $9,615
269,925
kWh
$950
-
kW-mo/yr
$950 $39,310
-
gal
$25 $(-22,900.0) $9,100 $227,646
TOTAL IMPLEMENTED $15,477 $11,205 $5,346
155,625
kWh
$950
-
kW-mo/yr
- - $25 - $9,100 $56
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Other Liquid (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs