ITAC Assessment: NC0252
ITAC logo
ITAC Assessment: NC0252
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Electrical outlets and switches
NAICS
n/a
SIC 3643: Current-Carrying Wiring Devices
Sales Range $50
M
to 100
M
# of Employees 300
Plant Area 155,000
ft2
Annual Production 100,000,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $364,509 12,647,100
kWh
Electricity Demand $247,432 26,407
kW-mo/yr
Electricity Fees $19,107 -
Natural Gas $27,612 4,031
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,092 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,311

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings
01 2.4239: Eliminate or reduce compressed air usage $14,411 $20,000 $8,714
302,578
kWh
$5,697
-
kW-mo/yr
-
02 2.7241: Install outside air damper / economizer on hvac unit $10,800 $6,000 $10,800
374,990
kWh
- -
03 2.7111: Reduce illumination to minimum necessary levels $240 $100 $145
5,040
kWh
$95
-
kW-mo/yr
-
04 2.2625: Chill water to the highest temperature possible $1,917 $400 $1,306
45,360
kWh
$611
-
kW-mo/yr
-
05 2.5194: Redesign process $4,814 $780 $3,281
113,935
kWh
$1,533
-
kW-mo/yr
-
06 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $780 $1,000 $384
13,345
kWh
$396
-
kW-mo/yr
-
07 3.4116: Meter recycled water (to reduce sewer charges) $130 $350 - - $130
-
Tgal
TOTAL RECOMMENDED $33,092 $28,630 $24,630
855,248
kWh
$8,332
-
kW-mo/yr
$130
-
Tgal
TOTAL IMPLEMENTED $18,311 $8,180 $15,771
547,630
kWh
$2,540
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs