ITAC Assessment: SD0057
ITAC logo
ITAC Assessment: SD0057
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product PAINTS,THINNERS,COATINGS
NAICS
n/a
SIC 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products
Sales Range $5
M
to 10
M
# of Employees 160
Plant Area
n/a
Annual Production 5,750,000
lb
Production Hrs. Annual 5,500
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $284,257 2,415,006
kWh
Natural Gas $6,160 943
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,825 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,599

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $2,064 $2,242 $2,064
17,585
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,309 $3,524 $2,309
19,637
kWh
-
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $13,057 - $13,057
-
kWh
-
04 2.7111: Reduce illumination to minimum necessary levels $4,870 $4,500 $4,870
41,325
kWh
-
05 2.6232: Install set-back timers $226 $115 $210
1,758
kWh
$16
06 2.7144: Install spectral reflectors / delamp $6,678 $12,550 $5,691
48,359
kWh
$987
07 2.6232: Install set-back timers $3,621 $3,920 $3,103
26,377
kWh
$518
TOTAL RECOMMENDED $32,825 $26,851 $31,304
155,041
kWh
$1,521
TOTAL IMPLEMENTED $32,599 $26,736 $31,094
153,283
kWh
$1,505
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs