Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,722

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Drugs
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SD0291 #03 Y:2002 Use photocell controls $14,793 $5,000
SD0291 #02 Y:2002 Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $324,586 $870,000
SD0291 #01 Y:2002 Use adjustable frequency drive or multiple speed motors on existing system $30,611 $48,000
LE0129 #05 Y:2001 Install compressor air intakes in coolest locations $1,270 $1,000
LE0129 #04 Y:2001 Improve lubrication practices $361 $200
LE0129 #03 Y:2001 Utilize energy-efficient belts and other improved mechanisms $723 -
LE0129 #02 Y:2001 Analyze flue gas for proper air/fuel ratio $3,610 $500
LE0129 #01 Y:2001 Reschedule plant operations or reduce load to avoid peaks $11,028 $2,500
NC0228 #05 Y:2001 Utilize other methods to remove contaminants $12,426 $39,808
NC0228 #04 Y:2001 Redesign process $74,974 $100,000
NC0228 #03 Y:2001 Interlock heating and air conditioning systems to prevent simultaneous operation $173,756 $88,000
NC0228 #02 Y:2001 Use compressor air filters $41,667 $10,600
NC0228 #01 Y:2001 Not found $296,000 $75,000
SF0224 #12 Y:2001 Optimize plant power factor $120,158 $160,000
SF0224 #11 Y:2001 Install occupancy sensors $17,495 $33,556
SF0224 #10 Y:2001 Add equipment/ operators to reduce production bottleneck $259,156 $256,500
SF0224 #09 Y:2001 Use most efficient type of electric motors $6,142 $6,113
SF0224 #08 Y:2001 Install timers on light switches in little used areas $11,660 $9,500
SF0224 #07 Y:2001 Analyze flue gas for proper air/fuel ratio $25,962 $13,200
SF0224 #06 Y:2001 Install compressor air intakes in coolest locations $6,146 $2,800