Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,730

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Drugs
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UF0627 #02 Y:2025 Replace existing chiller with high efficiency model $16,402 $72,000
UF0627 #01 Y:2025 Use demand controller or load shedder $19,980 $20,761
UC2502 #07 Y:2025 Replace existing hvac unit with high efficiency model $493 $2,446
UC2502 #06 Y:2025 Turn off equipment when not in use $12,866 $75
UC2502 #05 Y:2025 Install occupancy sensors $10,766 $2,067
UC2502 #04 Y:2025 Utilize higher efficiency lamps and/or ballasts $11,421 $3,292
UC2502 #03 Y:2025 Reduce the pressure of compressed air to the minimum required $21,295 $75
UC2502 #02 Y:2025 Pay utility bills on time $39,411 -
UC2502 #01 Y:2025 Apply for tax-free status for energy purchases $3,276 -
SD0665 #06 Y:2024 Replace existing chiller with high efficiency model $74,386 $209,425
SD0665 #05 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $3,342 $2,233
SD0665 #04 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $58,983 $101,750
SD0665 #03 Y:2024 Adopt in-house material generation $23,739 $46,406
SD0665 #02 Y:2024 Use battery storage for demand control $203,574 $5,892
SD0665 #01 Y:2024 Use solar heat to make electricty $614,791 $395,505
SF0628 #03 Y:2024 Purchase new equipment to reduce material use / cost $1,061 $6,460
SF0628 #02 Y:2024 Utilize higher efficiency lamps and/or ballasts $1,482 $770
SF0628 #01 Y:2024 Turn off equipment when not in use $72,544 -
SF0623 #05 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $1,720 $4,257
SF0623 #04 Y:2024 Utilize higher efficiency lamps and/or ballasts $2,599 $3,962