ITAC Assessment: SF0628
ITAC logo
ITAC Assessment: SF0628
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Synthetic Peptides
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 30,000
ft2
Annual Production 12,000,000
lb
Production Hrs. Annual 2,340
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $183,131 1,017,657
kWh
Electricity Demand $92,329 3,378
kW-mo/yr
Electricity Fees $275,765 -
Natural Gas $52,456 2,664
MMBtu
TOTAL YEARLY COSTS $603,681
RECOMMENDED SAVINGS* $75,087 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.6218: Turn off equipment when not in use $72,544 - $62,719
347,861
kWh
- $9,825
-
MMBtu
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,482 $770 $1,091
6,053
kWh
$228
-
kW-mo/yr
- $42 $121
03 4.132: Purchase new equipment to reduce material use / cost $1,061 $6,460 $864
4,792
kWh
$197
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $75,087 $7,230 $64,674
358,706
kWh
$425
-
kW-mo/yr
$9,825
-
MMBtu
$42 $121
TOTAL IMPLEMENTED - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs