ITAC Assessment: OR0688
ITAC logo
ITAC Assessment: OR0688
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Printing
NAICS 322212: Folding Paperboard Box Manufacturing
SIC 2657: Folding Paperboard Boxes, Including Sanitary
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 96,515
ft2
Annual Production 108,000,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $178,884 2,104,520
kWh
Electricity Demand $1 6,239
kW-mo/yr
Electricity Fees $12,075 -
Natural Gas $86,421 13,186
MMBtu
TOTAL YEARLY COSTS $277,381
RECOMMENDED SAVINGS* $36,866 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,652

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $3,431 $448 - - $3,431
-
MMBtu
02 2.7232: Replace existing hvac unit with high efficiency model $9,221 $180,000 $4,928
57,978
kWh
- $4,293
-
MMBtu
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,049 - $3,049
35,873
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $21,165 - $21,164
248,991
kWh
$1
-
kW-mo/yr
-
TOTAL RECOMMENDED $36,866 $180,448 $29,141
342,842
kWh
$1
-
kW-mo/yr
$7,724
-
MMBtu
TOTAL IMPLEMENTED $12,652 $180,448 $4,928
57,978
kWh
- $7,724
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs