ITAC Assessment: LT8393
ITAC logo
ITAC Assessment: LT8393
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Frozen Potatoes
NAICS 311411: Frozen Fruit, Juice, and Vegetable Manufacturing
SIC 2037: Frozen Fruits, Fruit Juices, and Vegetables
Sales Range $100
M
to 500
M
# of Employees 280
Plant Area 216,000
ft2
Annual Production 150,000,000
lb
Production Hrs. Annual 7,200
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,305,588 30,217,600
kWh
Electricity Demand $641,287 58,620
kW-mo/yr
LPG $840,004 224,174
MMBtu
Waste Disposal Costs
Water Usage $894,848 234,076
Tgal
Water Disposal $1,209,107 211,611
Tgal
TOTAL YEARLY COSTS $5,890,834
RECOMMENDED SAVINGS* $46,622 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,550 $5,285 $5,287
69,289
kWh
$1,263
-
kW-mo/yr
02 2.6218: Turn off equipment when not in use $4,093 $1,000 $4,093
53,640
kWh
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $35,979 $269,568 $35,979
471,548
kWh
-
TOTAL RECOMMENDED $46,622 $275,853 $45,359
594,478
kWh
$1,263
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs