Assessment Year | 2007 |
---|---|
Principal Product | counter and sink tops, shower enclosures |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 55 |
Plant Area |
40,000
ft2
|
Annual Production | 25,000
pieces
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $37,368 | 33,720 |
kWh
|
$1.11 |
Electricity Demand | $10,826 | 1,344 |
kW-mo/yr
|
$8.06 |
Electricity Fees | $3,021 | - |
|
- |
Natural Gas | $7,772 | 761 |
MMBtu
|
$10.21 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $6,830 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,593 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,920 | $300 |
$1,539
13,715
kWh
|
$381
-
kW-mo/yr
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,274 | $1,332 |
$1,050
9,366
kWh
|
$224
-
kW-mo/yr
|
- | |
03 | 2.7135: Install occupancy sensors | $399 | $492 |
$317
2,882
kWh
|
$82
-
kW-mo/yr
|
- | |
04 | 2.2511: Insulate bare equipment | $1,126 | $2,145 | - | - |
$1,126
-
MMBtu
|
|
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $644 | $4,267 |
$505
5,782
kWh
|
$139
-
kW-mo/yr
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,467 | $9,827 |
$1,178
10,502
kWh
|
$289
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $6,830 | $18,363 |
$4,589
42,247
kWh
|
$1,115
-
kW-mo/yr
|
$1,126
-
MMBtu
|
||
TOTAL IMPLEMENTED | $3,593 | $2,124 |
$2,906
25,963
kWh
|
$687
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs