ITAC Assessment: SF0350
ITAC logo
ITAC Assessment: SF0350
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product counter and sink tops, shower enclosures
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 55
Plant Area 40,000
ft2
Annual Production 25,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $37,368 33,720
kWh
Electricity Demand $10,826 1,344
kW-mo/yr
Electricity Fees $3,021 -
Natural Gas $7,772 761
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,830 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,593

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,920 $300 $1,539
13,715
kWh
$381
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,274 $1,332 $1,050
9,366
kWh
$224
-
kW-mo/yr
-
03 2.7135: Install occupancy sensors $399 $492 $317
2,882
kWh
$82
-
kW-mo/yr
-
04 2.2511: Insulate bare equipment $1,126 $2,145 - - $1,126
-
MMBtu
05 2.4231: Reduce the pressure of compressed air to the minimum required $644 $4,267 $505
5,782
kWh
$139
-
kW-mo/yr
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,467 $9,827 $1,178
10,502
kWh
$289
-
kW-mo/yr
-
TOTAL RECOMMENDED $6,830 $18,363 $4,589
42,247
kWh
$1,115
-
kW-mo/yr
$1,126
-
MMBtu
TOTAL IMPLEMENTED $3,593 $2,124 $2,906
25,963
kWh
$687
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs