Assessment Year | 2005 |
---|---|
Principal Product | gypsum board products |
NAICS | 327420: Gypsum Product Manufacturing |
SIC | 3275: Gypsum Products |
Sales Range | $100 M to 500M |
# of Employees | 130 |
Plant Area |
600,000
ft2
|
Annual Production | 1,300,000
thousand feet
|
Production Hrs. Annual | 6,616
hrs
|
Location (State) | Nevada |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $869,735 | 17,642,832 |
kWh
|
$0.049 |
Electricity Demand | $107,159 | 27,816 |
kW-mo/yr
|
$3.85 |
Natural Gas | $929,178 | 96,737 |
MMBtu
|
$9.61 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $520,926 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $393,520 | $200,000 | - | - |
$393,520
-
MMBtu
|
|
02 | 2.4224: Upgrade controls on compressors | $46,489 | $10,000 |
$42,036
854,396
kWh
|
$4,453
-
kW-mo/yr
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $28,210 | $1,000 |
$25,516
518,617
kWh
|
$2,694
-
kW-mo/yr
|
- | |
04 | 2.4226: Use / purchase optimum sized compressor | $21,234 | $10,000 |
$19,214
390,534
kWh
|
$2,020
-
kW-mo/yr
|
- | |
05 | 2.2136: Install / repair insulation on steam lines | $20,625 | $11,478 | - | - |
$20,625
-
MMBtu
|
|
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $10,848 | $1,000 |
$9,994
203,140
kWh
|
$854
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $520,926 | $233,478 |
$96,760
1,966,687
kWh
|
$10,021
-
kW-mo/yr
|
$414,145
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs