Assessment Year | 1995 |
---|---|
Principal Product | Flexible Rubber |
NAICS |
n/a
|
SIC | 3567: Industrial Process Furnaces and Ovens |
Sales Range | $10 M to 50M |
# of Employees | 134 |
Plant Area |
55,000
ft2
|
Annual Production | 540,000
pieces
|
Production Hrs. Annual | 41,600
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $127,857 | 1,901,231 |
kWh
|
$0.067 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $66,880 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $266 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $37,079 | $35,142 |
$55,208
820,926
kWh
|
$(-18,129.0)
-
MMBtu
|
|
02 | 2.7231: Use radiant heater for spot heating | $23,442 | $62,400 |
$23,442
143,611
kWh
|
- | |
03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $822 | $2,276 |
$1,033
15,240
kWh
|
$(-211.0)
-
MMBtu
|
|
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,914 | $6,490 |
$1,914
28,429
kWh
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $895 | $576 |
$895
13,189
kWh
|
- | |
06 | 2.4221: Install compressor air intakes in coolest locations | $816 | $202 |
$816
12,016
kWh
|
- | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $741 | $2,789 |
$741
11,137
kWh
|
- | |
08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $266 | $100 |
$266
4,103
kWh
|
- | |
09 | 2.4133: Use most efficient type of electric motors | $818 | $2,789 |
$818
12,309
kWh
|
- | |
10 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $87 | $130 |
$87
1,172
kWh
|
- | |
TOTAL RECOMMENDED | $66,880 | $112,894 |
$85,220
1,062,132
kWh
|
$(-18,340.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $266 | $100 |
$266
4,103
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs