ITAC Assessment: UM0129
ITAC logo
ITAC Assessment: UM0129
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Baked Graphite Seals
NAICS
n/a
SIC 3624: Carbon and Graphite Products
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area 60,000
ft2
Annual Production 0
units
Production Hrs. Annual 8,760
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $143,865 4,288,394
kWh
Electricity Demand $77,713 9,060
kW-mo/yr
Electricity Fees $21,206 -
Natural Gas $308,434 94,036
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $191,367 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings By-product Production Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $7,119 $13,195 $5,470
140,973
kWh
$1,649
-
kW-mo/yr
- - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $21,707 $23,612 $10,990
313,892
kWh
- - $10,717 - -
03 2.1224: Replace boiler $78,528 $13,800 - - $528
-
MMBtu
- $78,000 -
04 2.2437: Recover waste heat from equipment $24,159 $17,000 - - $24,159
-
MMBtu
- - -
05 4.122: Develop standard procedures to improve internal yields $56,391 $122,400 - - - - - $56,391
06 4.514: Re-arrange equipment layout to reduce handling costs $3,463 $19,860 - - - $3,463 - -
TOTAL RECOMMENDED $191,367 $209,867 $16,460
454,865
kWh
$1,649
-
kW-mo/yr
$24,687
-
MMBtu
$14,180 $78,000 $56,391
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs