Assessment Year | 1987 |
---|---|
Principal Product | ROCKET ASSEMBLIES |
NAICS |
n/a
|
SIC | 3769: Guided Missile Space Vehicle Parts and Auxiliary Equipment, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
n/a
|
Annual Production | 39,000
pieces
|
Production Hrs. Annual | 5,200
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $118,072 | 2,050,117 |
kWh
|
$0.058 |
Natural Gas | $82,329 | 19,226 |
MMBtu
|
$4.28 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $57,032 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $21,346 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,886 | $2,200 | - |
$2,886
-
MMBtu
|
|
02 | 2.6218: Turn off equipment when not in use | $799 | $700 | - |
$799
-
MMBtu
|
|
03 | 2.2136: Install / repair insulation on steam lines | $1,180 | $1,020 | - |
$1,180
-
MMBtu
|
|
04 | 2.7221: Lower temperature during the winter season and vice-versa | $9,431 | $3,200 | - |
$9,431
-
MMBtu
|
|
05 | 2.7243: Improve air circulation with destratification fans / other methods | $4,852 | $5,000 |
$(-442.0)
(-7,620)
kWh
|
$5,294
-
MMBtu
|
|
06 | 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle | $13,610 | $30,000 |
$(-1,398.0)
(-24,326)
kWh
|
$15,008
-
MMBtu
|
|
07 | 2.7231: Use radiant heater for spot heating | $11,670 | $40,000 | - |
$11,670
-
MMBtu
|
|
08 | 2.4221: Install compressor air intakes in coolest locations | $982 | $500 |
$982
16,999
kWh
|
- | |
09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,794 | $500 |
$3,794
65,944
kWh
|
- | |
10 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $3,575 | $6,500 |
$4,728
63,306
kWh
|
$(-1,153.0)
-
MMBtu
|
|
11 | 2.3191: Use demand controller or load shedder | $2,380 | $2,000 |
$2,380
-
kWh
|
- | |
12 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,873 | $720 |
$1,873
32,532
kWh
|
- | |
TOTAL RECOMMENDED | $57,032 | $92,340 |
$11,917
146,835
kWh
|
$45,115
-
MMBtu
|
||
TOTAL IMPLEMENTED | $21,346 | $9,120 |
$9,029
115,475
kWh
|
$12,317
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs