ITAC Assessment: SF0623
ITAC logo
ITAC Assessment: SF0623
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Synthetic Peptides
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range $10
M
to 50
M
# of Employees 30
Plant Area 50,000
ft2
Annual Production 12,000,000
units
Production Hrs. Annual 2,080
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $102,319 659,977
kWh
Electricity Demand $51,128 1,399
kW-mo/yr
Natural Gas $32,672 1,670
MMBtu
TOTAL YEARLY COSTS $186,119
RECOMMENDED SAVINGS* $16,345 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Product Savings
01 2.6218: Turn off equipment when not in use $4,288 - $4,288
27,660
kWh
- - - -
02 2.7314: Reduce ventilation air $4,851 - $2,268
14,632
kWh
- $2,583
-
MMBtu
- -
03 2.6231: Utilize controls to operate equipment only when needed $2,887 $1,146 $2,887
18,623
kWh
- - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,599 $3,962 $1,292
8,332
kWh
$1,205
-
kW-mo/yr
- $110 $(-7.9)
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,720 $4,257 $1,720
11,097
kWh
- - - -
TOTAL RECOMMENDED $16,345 $9,365 $12,455
80,344
kWh
$1,205
-
kW-mo/yr
$2,583
-
MMBtu
$110 $(-7.9)
TOTAL IMPLEMENTED - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs