| Assessment Year | 2005 |
|---|---|
| Principal Product | PVC Pipes |
| NAICS | 332996: Fabricated Pipe and Pipe Fitting Manufacturing |
| SIC | 3084: Plastics Pipe |
| Sales Range | $10 M to 50M |
| # of Employees | 100 |
| Plant Area |
107,400
ft2
|
| Annual Production | 124,000,000
lb
|
| Production Hrs. Annual | 8,400
hrs
|
| Location (State) | Wisconsin |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $637,857 | 19,885,600 |
kWh
|
$0.032 |
| Electricity Demand | $326,257 | 34,343 |
kW-mo/yr
|
$9.50 |
| Natural Gas | $55,128 | 5,206 |
MMBtu
|
$10.59 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $107,577 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $57,577 | $25,000 | - |
$57,577
-
kW-mo/yr
|
|
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $28,617 | $52,200 |
$20,112
596,820
kWh
|
$8,505
-
kW-mo/yr
|
|
| 03 | 2.4221: Install compressor air intakes in coolest locations | $7,522 | $640 |
$4,944
146,709
kWh
|
$2,578
-
kW-mo/yr
|
|
| 04 | 2.4235: Remove or close off unneeded compressed air lines | $5,380 | - |
$5,380
159,660
kWh
|
- | |
| 05 | 2.4312: Improve lubrication practices | $4,137 | $4,810 |
$3,319
98,476
kWh
|
$818
-
kW-mo/yr
|
|
| 06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,252 | $2,032 |
$1,584
46,998
kWh
|
$668
-
kW-mo/yr
|
|
| 07 | 2.4239: Eliminate or reduce compressed air usage | $2,092 | $208 |
$2,092
62,077
kWh
|
- | |
| TOTAL RECOMMENDED | $107,577 | $84,890 |
$37,431
1,110,740
kWh
|
$70,146
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs