ITAC Assessment: HO0098
ITAC logo
ITAC Assessment: HO0098
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Janitorial Equipment
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 350
Plant Area 230,000
ft2
Annual Production 485,000
pieces
Production Hrs. Annual 2,860
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $177,481 1,096,424
kWh
Fuel Oil #4 $39,215 7,410
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,250 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #4 Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $9,000 $6,480 $9,000
54,513
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $725 $1,037 $725
4,103
kWh
-
03 2.1232: Keep boiler tubes clean $5,302 $2,000 - $5,302
-
MMBtu
04 2.4133: Use most efficient type of electric motors $356 $800 $356
2,345
kWh
-
05 2.4221: Install compressor air intakes in coolest locations $1,393 $900 $1,393
8,792
kWh
-
06 2.6218: Turn off equipment when not in use $2,520 - $697
4,396
kWh
$1,823
-
MMBtu
07 2.2136: Install / repair insulation on steam lines $269 $338 - $269
-
MMBtu
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $685 $900 $685
4,396
kWh
-
TOTAL RECOMMENDED $20,250 $12,455 $12,856
78,545
kWh
$7,394
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #4 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs