Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

88

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Manmade organic fibers, except cellulosic
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IC0277 #02 Y:2023 Insulate bare equipment $5,585 $3,405
IC0277 #01 Y:2023 Increase amount of condensate returned $64,155 $52,421
UU0125 #08 Y:2017 Reduce space conditioning during non-working hours $1,690 -
UU0125 #07 Y:2017 Minimize water usage $3,700 $200
UU0125 #06 Y:2017 Install occupancy sensors $4,418 $7,220
UU0125 #05 Y:2017 Replace existing chiller with high efficiency model $5,417 $39,198
UU0125 #04 Y:2017 Recover and reuse waste material $6,187 $3,150
UU0125 #03 Y:2017 Reduce the pressure of compressed air to the minimum required $7,110 $20
UU0125 #02 Y:2017 Utilize higher efficiency lamps and/or ballasts $9,851 $18,588
UU0125 #01 Y:2017 Replace fossil fuel equipment with electrical equipment $32,802 -
MS0360 #03 Y:2010 Utilize higher efficiency lamps and/or ballasts $8,606 $18,481
MS0360 #02 Y:2010 Use adjustable frequency drive or multiple speed motors on existing system $91,795 $240,500
MS0360 #01 Y:2010 Recover waste heat from equipment $244,785 $930,000
MS0362 #01 Y:2010 Install smaller boiler (increase high fire duty cycle) $129,172 $586,857
UA0048 #07 Y:2009 Eliminate leaks in inert gas and compressed air lines/ valves $1,230 $2,000
UA0048 #06 Y:2009 Reduce the pressure of compressed air to the minimum required $1,450 -
UA0048 #05 Y:2009 Make a practice of turning off lights when not needed $1,545 -
UA0048 #04 Y:2009 Install occupancy sensors $3,976 $728
UA0048 #03 Y:2009 Turn off equipment when not in use $6,421 -
UA0048 #02 Y:2009 Install vinyl strip / high speed / air curtain doors $486 -