ITAC Assessment: IC0277
ITAC logo
ITAC Assessment: IC0277
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Water Soluble Film
NAICS 325220: Artificial and Synthetic Fibers and Filaments Manufacturing
SIC 2824: Manmade Organic Fibers, Except Cellulosic
Sales Range $100
M
to 500
M
# of Employees 121
Plant Area 209,720
ft2
Annual Production 10,039
ton
Production Hrs. Annual 8,760
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $399,516 8,978,688
kWh
Electricity Demand $441,649 16,990
kW-mo/yr
Electricity Fees $236,394 -
Natural Gas $1,750,283 264,824
MMBtu
TOTAL YEARLY COSTS $2,827,842
RECOMMENDED SAVINGS* $712,015 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,231

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2121: Increase amount of condensate returned $64,155 $52,421 - - $64,155
-
MMBtu
02 2.2511: Insulate bare equipment $5,585 $3,405 - - $5,585
-
MMBtu
03 2.2135: Repair and eliminate steam leaks $8,672 $1,280 - - $8,672
-
MMBtu
04 2.1212: Operate boilers on high fire setting $6,360 $36 - - $6,360
-
MMBtu
05 2.9114: Use solar heat to make electricty $81,821 $1,271,713 $63,621
1,413,792
kWh
$18,200
-
kW-mo/yr
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $39,159 $20,704 $21,079
468,420
kWh
$18,080
-
kW-mo/yr
-
07 2.2437: Recover waste heat from equipment $104,870 $6,974 - - $104,870
-
MMBtu
08 2.7135: Install occupancy sensors $1,974 $5,963 $1,656
36,792
kWh
$319
-
kW-mo/yr
-
09 2.2427: Use waste heat from hot flue gases to preheat incoming fluids $7,769 $36,842 - - $7,769
-
MMBtu
10 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $391,650 $2,055,740 $748,683
(-860,557)
kWh
- $(-357,033.0)
-
MMBtu
TOTAL RECOMMENDED $712,015 $3,455,078 $835,038
1,058,447
kWh
$36,599
-
kW-mo/yr
$(-159,622.0)
-
MMBtu
TOTAL IMPLEMENTED $16,231 $10,648 $1,656
36,792
kWh
$319
-
kW-mo/yr
$14,257
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs