Assessment Year | 2022 |
---|---|
Principal Product | Interior trim, consoles, instrument panels, etc. |
NAICS | 336360: Motor Vehicle Seating and Interior Trim Manufacturing |
SIC | 2396: Automotive Trimmings, Apparel Findings, and Related Products |
Sales Range | $50 M to 100M |
# of Employees | 220 |
Plant Area |
150,000
ft2
|
Annual Production | 450,000
units
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $550,992 | 6,143,910 |
kWh
|
$0.090 | |
Electricity Demand | $121,200 | 26,292 |
kW-mo/yr
|
$4.61 | |
Electricity Fees | $2,835 | - |
|
- | |
Natural Gas | $84,008 | 10,822 |
MMBtu
|
$7.76 | |
Waste Disposal Costs | |||||
Water Usage | $25,224 | 6,370 |
Tgal
|
$3.96 | |
TOTAL YEARLY COSTS | $784,259 | ||||
RECOMMENDED SAVINGS* | $72,627 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $12,812 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $32,107 | $30,064 |
$29,124
323,598
kWh
|
$2,984
-
kW-mo/yr
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $19,203 | $4,540 |
$17,941
199,354
kWh
|
$1,262
-
kW-mo/yr
|
- | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $8,023 | - |
$4,140
45,997
kWh
|
$3,884
-
kW-mo/yr
|
- | |
04 | 2.7211: Clean and maintain refrigerant condensers and towers | $6,530 | - |
$5,923
65,815
kWh
|
$607
-
kW-mo/yr
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,680 | $4,307 |
$4,609
51,211
kWh
|
$71
-
kW-mo/yr
|
- | |
06 | 2.2211: Use optimum temperature | $1,469 | $155 |
$1,469
16,322
kWh
|
- | - | |
07 | 2.6218: Turn off equipment when not in use | $414 | $349 |
$414
4,601
kWh
|
- | - | |
08 | 2.6218: Turn off equipment when not in use | $109 | - |
$109
1,214
kWh
|
- | - | |
09 | 2.2437: Recover waste heat from equipment | $91 | $261 | - | - |
$91
-
MMBtu
|
|
TOTAL RECOMMENDED | $72,627 | $39,676 |
$63,729
708,112
kWh
|
$8,807
-
kW-mo/yr
|
$91
-
MMBtu
|
||
TOTAL IMPLEMENTED | $12,812 | $4,307 |
$8,858
98,422
kWh
|
$3,954
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs