ITAC Assessment: MU0014
ITAC logo
ITAC Assessment: MU0014
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Interior trim, consoles, instrument panels, etc.
NAICS 336360: Motor Vehicle Seating and Interior Trim Manufacturing
SIC 2396: Automotive Trimmings, Apparel Findings, and Related Products
Sales Range $50
M
to 100
M
# of Employees 220
Plant Area 150,000
ft2
Annual Production 450,000
units
Production Hrs. Annual 6,000
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $550,992 6,143,910
kWh
Electricity Demand $121,200 26,292
kW-mo/yr
Electricity Fees $2,835 -
Natural Gas $84,008 10,822
MMBtu
Waste Disposal Costs
Water Usage $25,224 6,370
Tgal
TOTAL YEARLY COSTS $784,259
RECOMMENDED SAVINGS* $72,627 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,812

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $32,107 $30,064 $29,124
323,598
kWh
$2,984
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $19,203 $4,540 $17,941
199,354
kWh
$1,262
-
kW-mo/yr
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $8,023 - $4,140
45,997
kWh
$3,884
-
kW-mo/yr
-
04 2.7211: Clean and maintain refrigerant condensers and towers $6,530 - $5,923
65,815
kWh
$607
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $4,680 $4,307 $4,609
51,211
kWh
$71
-
kW-mo/yr
-
06 2.2211: Use optimum temperature $1,469 $155 $1,469
16,322
kWh
- -
07 2.6218: Turn off equipment when not in use $414 $349 $414
4,601
kWh
- -
08 2.6218: Turn off equipment when not in use $109 - $109
1,214
kWh
- -
09 2.2437: Recover waste heat from equipment $91 $261 - - $91
-
MMBtu
TOTAL RECOMMENDED $72,627 $39,676 $63,729
708,112
kWh
$8,807
-
kW-mo/yr
$91
-
MMBtu
TOTAL IMPLEMENTED $12,812 $4,307 $8,858
98,422
kWh
$3,954
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs