| Assessment Year | 2017 |
|---|---|
| Principal Product | Carbon Fiber, Synthetic Resins, Prepreg Material |
| NAICS | 335991: Carbon and Graphite Product Manufacturing |
| SIC | 2824: Manmade Organic Fibers, Except Cellulosic |
| Sales Range | $100 M to 500M |
| # of Employees | 423 |
| Plant Area |
200,000
ft2
|
| Annual Production | 3,250,000
lb
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Utah |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $910,959 | 27,854,237 |
kWh
|
$0.033 | |
| Electricity Demand | $41,677 | 3,571 |
kW-mo/yr
|
$11.67 | |
| Electricity Fees | $282,474 | - |
|
- | |
| Natural Gas | $401,529 | 135,797 |
MMBtu
|
$2.96 | |
| Waste Disposal Costs | |||||
| Water Usage | $45,504 | 38,700 |
Tgal
|
$1.18 | |
| Water Disposal | $29,134 | 10,368 |
Tgal
|
$2.81 | |
| Other Liquid (non-haz) | $314,165 | 72,455 |
gal
|
$4.34 | |
| Other Liquid (haz) | $464,948 | 116,070 |
gal
|
$4.01 | |
| Solid Waste (non-haz) | $30,460 | 906,000 |
lb
|
$0.034 | |
| Gaseous Waste | $71 | 101,712,096 |
lb
|
$0.000 | |
| TOTAL YEARLY COSTS | $2,520,921 | ||||
| RECOMMENDED SAVINGS* | $71,175 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $24,156 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Usage Savings | Solid Waste (non-haz) Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.1321: Replace fossil fuel equipment with electrical equipment | $32,802 | - |
$25,275
772,929
kWh
|
$13,562
-
kW-mo/yr
|
$2,581 |
$(-8,615.3)
-
MMBtu
|
- | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,851 | $18,588 |
$6,227
190,456
kWh
|
$3,624
-
kW-mo/yr
|
- | - | - | - | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $7,110 | $20 |
$3,778
115,536
kWh
|
$2,799
-
kW-mo/yr
|
$533 | - | - | - | |
| 04 | 3.5311: Recover and reuse waste material | $6,187 | $3,150 | - | - | - | - | - |
$6,187
-
lb
|
|
| 05 | 2.2622: Replace existing chiller with high efficiency model | $5,417 | $39,198 |
$1,459
44,208
kWh
|
$3,958
-
kW-mo/yr
|
- | - | - | - | |
| 06 | 2.7135: Install occupancy sensors | $4,418 | $7,220 |
$4,418
135,121
kWh
|
- | - | - | - | - | |
| 07 | 3.4151: Minimize water usage | $3,700 | $200 | - | - | - | - |
$3,700
-
Tgal
|
- | |
| 08 | 2.7224: Reduce space conditioning during non-working hours | $1,690 | - |
$268
8,186
kWh
|
- | - |
$1,422
-
MMBtu
|
- | - | |
| TOTAL RECOMMENDED | $71,175 | $68,376 |
$41,424
1,266,436
kWh
|
$23,943
-
kW-mo/yr
|
$3,114 |
$(-7,192.9)
-
MMBtu
|
$3,700
-
Tgal
|
$6,187
-
lb
|
||
| TOTAL IMPLEMENTED | $24,156 | $29,158 |
$10,645
325,577
kWh
|
$3,624
-
kW-mo/yr
|
- | - |
$3,700
-
Tgal
|
$6,187
-
lb
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Usage Savings | Solid Waste (non-haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs