ITAC Assessment: LE0276
ITAC logo
ITAC Assessment: LE0276
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Plastic Closures
NAICS 424130: Industrial and Personal Service Paper Merchant Wholesalers
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 190,000
ft2
Annual Production 1,500,000,000
pieces
Production Hrs. Annual 8,568
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,211,828 10,727,175
kWh
Electricity Demand $90,244 20,334
kW-mo/yr
Natural Gas $43,951 3,344
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $332,881 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $162,230

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.7232: Replace existing hvac unit with high efficiency model $144,000 $92,000 - - $144,000 - - -
02 2.2614: Use cooling tower or economizer to replace chiller cooling $55,360 $30,000 $55,067
487,318
kWh
$293
-
kW-mo/yr
- - - -
03 2.3134: Shift from daytime to nighttime operation $38,127 $30,600 - - $38,127 - - -
04 2.7232: Replace existing hvac unit with high efficiency model $18,230 $16,000 $17,222
152,410
kWh
$1,008
-
kW-mo/yr
- - - -
05 2.8113: Purchase gas directly from a contract gas supplier $15,550 $500 - - - - - $15,550
06 2.7447: Install vinyl strip / high speed / air curtain doors $10,749 $16,800 - - - $10,749
-
MMBtu
- -
07 2.7496: Install partitions to reduce size of conditioned space $1,838 $3,600 - - - $1,838
-
MMBtu
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $36,479 $53,518 $33,954
300,480
kWh
$1,869
-
kW-mo/yr
- - $656 -
09 2.7135: Install occupancy sensors $12,548 $600 $12,548
111,041
kWh
- - - - -
TOTAL RECOMMENDED $332,881 $243,618 $118,791
1,051,249
kWh
$3,170
-
kW-mo/yr
$182,127 $12,587
-
MMBtu
$656 $15,550
TOTAL IMPLEMENTED $162,230 $108,000 $17,222
152,410
kWh
$1,008
-
kW-mo/yr
$144,000 - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs