ITAC Assessment: BS0010
ITAC logo
ITAC Assessment: BS0010
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Tea Bags
NAICS 311999: All Other Miscellaneous Food Manufacturing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 61
Plant Area 62,400
ft2
Annual Production 13,000,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $53,193 1,452,840
kWh
Electricity Demand $14,811 3,717
kW-mo/yr
Electricity Fees $8,049 -
Natural Gas $5,691 766
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,053 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $867

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7111: Reduce illumination to minimum necessary levels $289 $630 $335
8,629
kWh
$72
-
kW-mo/yr
$(-118.3)
-
MMBtu
02 2.2511: Insulate bare equipment $222 $512 $97
2,488
kWh
$126
-
kW-mo/yr
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $6,826 $750 $5,133
132,106
kWh
$1,693
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $645 $251 $484
12,480
kWh
$161
-
kW-mo/yr
-
05 2.3132: Recharge batteries on during off-peak demand periods $70 $60 - $70
-
kW-mo/yr
-
TOTAL RECOMMENDED $8,053 $2,203 $6,049
155,703
kWh
$2,122
-
kW-mo/yr
$(-118.3)
-
MMBtu
TOTAL IMPLEMENTED $867 $763 $581
14,968
kWh
$287
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs