| Assessment Year | 1993 |
|---|---|
| Principal Product | Bulk Pharmaceuticals |
| NAICS |
n/a
|
| SIC | 2834: Pharmaceutical Preparations |
| Sales Range | $10 M to 50M |
| # of Employees | 97 |
| Plant Area |
40,000
ft2
|
| Annual Production | 189,000
lb
|
| Production Hrs. Annual | 7,344
hrs
|
| Location (State) | Michigan |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $203,780 | 3,742,673 |
kWh
|
$0.054 |
| Natural Gas | $111,370 | 32,760 |
MMBtu
|
$3.40 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $75,215 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $23,501 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Primary Raw Material Savings |
|---|---|---|---|---|---|---|---|
| 01 | 3.6112: Use filter and drying oven to reduce sludge volume | $49,625 | $65,000 | - | - | $49,625 | |
| 02 | 2.2511: Insulate bare equipment | $17,985 | $18,200 |
$2,100
39,273
kWh
|
$15,885
-
MMBtu
|
- | |
| 03 | 2.4133: Use most efficient type of electric motors | $2,640 | $21,590 |
$2,640
49,824
kWh
|
- | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,876 | $3,837 |
$2,876
50,996
kWh
|
- | - | |
| 05 | 2.7111: Reduce illumination to minimum necessary levels | $939 | $160 |
$939
17,585
kWh
|
- | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $790 | $430 |
$790
4,982
kWh
|
- | - | |
| 07 | 2.4221: Install compressor air intakes in coolest locations | $235 | $200 |
$235
4,396
kWh
|
- | - | |
| 08 | 2.4221: Install compressor air intakes in coolest locations | $125 | $200 |
$125
2,345
kWh
|
- | - | |
| TOTAL RECOMMENDED | $75,215 | $109,617 |
$9,705
169,401
kWh
|
$15,885
-
MMBtu
|
$49,625 | ||
| TOTAL IMPLEMENTED | $23,501 | $43,627 |
$7,616
140,093
kWh
|
$15,885
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Primary Raw Material Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs