ITAC Assessment: ND0169
ITAC logo
ITAC Assessment: ND0169
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Bulk Pharmaceuticals
NAICS
n/a
SIC 2834: Pharmaceutical Preparations
Sales Range $10
M
to 50
M
# of Employees 97
Plant Area 40,000
ft2
Annual Production 189,000
lb
Production Hrs. Annual 7,344
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $203,780 3,742,673
kWh
Natural Gas $111,370 32,760
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $75,215 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,501

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Primary Raw Material Savings
01 3.6112: Use filter and drying oven to reduce sludge volume $49,625 $65,000 - - $49,625
02 2.2511: Insulate bare equipment $17,985 $18,200 $2,100
39,273
kWh
$15,885
-
MMBtu
-
03 2.4133: Use most efficient type of electric motors $2,640 $21,590 $2,640
49,824
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,876 $3,837 $2,876
50,996
kWh
- -
05 2.7111: Reduce illumination to minimum necessary levels $939 $160 $939
17,585
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $790 $430 $790
4,982
kWh
- -
07 2.4221: Install compressor air intakes in coolest locations $235 $200 $235
4,396
kWh
- -
08 2.4221: Install compressor air intakes in coolest locations $125 $200 $125
2,345
kWh
- -
TOTAL RECOMMENDED $75,215 $109,617 $9,705
169,401
kWh
$15,885
-
MMBtu
$49,625
TOTAL IMPLEMENTED $23,501 $43,627 $7,616
140,093
kWh
$15,885
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs