ITAC Assessment: GT0760
ITAC logo
ITAC Assessment: GT0760
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product AUTOMOTIVE SEAT BELTS & AIR BAG COMPONENTS
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $50
M
to 100
M
# of Employees 365
Plant Area 290,000
ft2
Annual Production 221,000,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,105,544 33,811,357
kWh
Electricity Demand $590,456 64,729
kW-mo/yr
Natural Gas $719,651 135,489
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $129,658 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $110,114

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings
01 2.3212: Optimize plant power factor $16,900 $6,000 - - $16,900 - -
02 2.8112: Combine utility meters $2,594 - - - $2,594 - -
03 2.4133: Use most efficient type of electric motors $17,540 $141,627 $11,831
285,997
kWh
$5,709
-
kW-mo/yr
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $15,867 $45,247 $15,867
251,455
kWh
- - - -
05 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $10,670 $9,380 $10,670
204,200
kWh
- - - -
06 2.4239: Eliminate or reduce compressed air usage $3,450 $900 $3,450
102,336
kWh
- - - -
07 2.2136: Install / repair insulation on steam lines $4,092 $1,540 - - - $4,092
-
MMBtu
-
08 2.1111: Control pressure on steamer operations $13,500 $13,200 - - - $13,500
-
MMBtu
-
09 3.5212: Regrind, reuse, or sell scrap plastic parts $23,100 - - - - - $23,100
10 2.2414: Use waste heat from hot flue gases to preheat $6,016 $10,000 - - - $6,016
-
MMBtu
-
11 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $10,195 - - - - $10,195
-
MMBtu
-
12 2.4221: Install compressor air intakes in coolest locations $5,734 $3,500 $5,734
103,149
kWh
- - - -
TOTAL RECOMMENDED $129,658 $231,394 $47,552
947,137
kWh
$5,709
-
kW-mo/yr
$19,494 $33,803
-
MMBtu
$23,100
TOTAL IMPLEMENTED $110,114 $217,294 $44,102
844,801
kWh
$5,709
-
kW-mo/yr
$16,900 $20,303
-
MMBtu
$23,100
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs