ITAC Assessment: MS0360
ITAC logo
ITAC Assessment: MS0360
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product PET Resin
NAICS 325220: Artificial and Synthetic Fibers and Filaments Manufacturing
SIC 2824: Manmade Organic Fibers, Except Cellulosic
Sales Range greater than $500
M
# of Employees 168
Plant Area 280,000
ft2
Annual Production 800,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $7,015,245 127,681,163
kWh
Electricity Demand $1,522,658 171,734
kW-mo/yr
Electricity Fees $831,150 -
Natural Gas $4,618,080 1,014,730
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $345,186 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $91,795

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $244,785 $930,000 $237,315
4,696,167
kWh
$58,309
-
kW-mo/yr
$18,001 $(-68,840.0)
-
MMBtu
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $91,795 $240,500 $91,676
1,814,143
kWh
- $119 -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $8,606 $18,481 $5,606
110,927
kWh
$2,296
-
kW-mo/yr
$704 -
TOTAL RECOMMENDED $345,186 $1,188,981 $334,597
6,621,237
kWh
$60,605
-
kW-mo/yr
$18,824 $(-68,840.0)
-
MMBtu
TOTAL IMPLEMENTED $91,795 $240,500 $91,676
1,814,143
kWh
- $119 -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs