9,322
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| NV0111 #01 Y:1998 | 01 | 1998 | Direct warmest air to combustion intake | $12,730 | $690 | |
| CO0422 #09 Y:1998 | 09 | 1998 | Modify process to reduce material use/cost | $9,500 | - | |
| CO0422 #08 Y:1998 | 08 | 1998 | Develop standard procedures to improve internal yields | $158,670 | $50,000 | |
| CO0422 #07 Y:1998 | 07 | 1998 | Use a less expensive method of waste removal | $400 | $130 | |
| CO0422 #06 Y:1998 | 06 | 1998 | Reduce / eliminate use of disposable product | $430 | - | |
| CO0422 #05 Y:1998 | 05 | 1998 | Contract a wood pallet recycling company | $430 | - | |
| CO0422 #04 Y:1998 | 04 | 1998 | Reduce illumination to minimum necessary levels | $560 | - | |
| CO0422 #03 Y:1998 | 03 | 1998 | Reschedule plant operations or reduce load to avoid peaks | $880 | $2,000 | |
| CO0422 #02 Y:1998 | 02 | 1998 | Utilize higher efficiency lamps and/or ballasts | $404 | $1,292 | |
| CO0422 #01 Y:1998 | 01 | 1998 | Check for accuracy of utility / power meters | $5,830 | - | |
| TN0635 #05 Y:1998 | 05 | 1998 | Change procedures / equipment / operating conditions | $8,180 | - | |
| TN0635 #04 Y:1998 | 04 | 1998 | Install / repair insulation on steam lines | $9,760 | $3,580 | |
| TN0635 #03 Y:1998 | 03 | 1998 | Use minimum steam operating pressure | $22,590 | $46,880 | |
| TN0635 #02 Y:1998 | 02 | 1998 | Install equipment (eg compactor) to reduce disposal costs | $39,020 | $13,600 | |
| TN0635 #01 Y:1998 | 01 | 1998 | Increase amount of condensate returned | $429,120 | $36,880 | |
| NC0143 #06 Y:1998 | 06 | 1998 | Replace existing equipment with more suitable substitutes | $45,561 | $55,000 | |
| NC0143 #05 Y:1998 | 05 | 1998 | Replace existing equipment with more suitable substitutes | $15,191 | $30,000 | |
| NC0143 #04 Y:1998 | 04 | 1998 | Reduce fluid flow rates | $2,040 | $2,500 | |
| NC0143 #03 Y:1998 | 03 | 1998 | Recover waste heat from equipment | $21,615 | $25,600 | |
| NC0143 #02 Y:1998 | 02 | 1998 | Replace existing equipment with more suitable substitutes | $50,294 | $280,937 |