Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,322

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Chemicals and allied products
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NV0111 #01 Y:1998 Direct warmest air to combustion intake $12,730 $690
CO0422 #09 Y:1998 Modify process to reduce material use/cost $9,500 -
CO0422 #08 Y:1998 Develop standard procedures to improve internal yields $158,670 $50,000
CO0422 #07 Y:1998 Use a less expensive method of waste removal $400 $130
CO0422 #06 Y:1998 Reduce / eliminate use of disposable product $430 -
CO0422 #05 Y:1998 Contract a wood pallet recycling company $430 -
CO0422 #04 Y:1998 Reduce illumination to minimum necessary levels $560 -
CO0422 #03 Y:1998 Reschedule plant operations or reduce load to avoid peaks $880 $2,000
CO0422 #02 Y:1998 Utilize higher efficiency lamps and/or ballasts $404 $1,292
CO0422 #01 Y:1998 Check for accuracy of utility / power meters $5,830 -
TN0635 #05 Y:1998 Change procedures / equipment / operating conditions $8,180 -
TN0635 #04 Y:1998 Install / repair insulation on steam lines $9,760 $3,580
TN0635 #03 Y:1998 Use minimum steam operating pressure $22,590 $46,880
TN0635 #02 Y:1998 Install equipment (eg compactor) to reduce disposal costs $39,020 $13,600
TN0635 #01 Y:1998 Increase amount of condensate returned $429,120 $36,880
NC0143 #06 Y:1998 Replace existing equipment with more suitable substitutes $45,561 $55,000
NC0143 #05 Y:1998 Replace existing equipment with more suitable substitutes $15,191 $30,000
NC0143 #04 Y:1998 Reduce fluid flow rates $2,040 $2,500
NC0143 #03 Y:1998 Recover waste heat from equipment $21,615 $25,600
NC0143 #02 Y:1998 Replace existing equipment with more suitable substitutes $50,294 $280,937