ITAC Assessment: NV0111
ITAC logo
ITAC Assessment: NV0111
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Lithium Products
NAICS
n/a
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 76
Plant Area 50,740
ft2
Annual Production 13,000,000
lb
Production Hrs. Annual 7,200
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $808,985 19,846,718
kWh
Electricity Demand $303,918 31,778
kW-mo/yr
Electricity Fees $(-47,655.0) -
LPG $60,935 10,484
MMBtu
Fuel Oil #6 $468,772 118,539
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $179,459 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,660

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Fuel Oil #6 Savings
01 2.1213: Direct warmest air to combustion intake $12,730 $690 - - - $12,730
-
MMBtu
02 2.2136: Install / repair insulation on steam lines $1,601 $1,601 - - - $1,601
-
MMBtu
03 2.2427: Use waste heat from hot flue gases to preheat incoming fluids $56,930 $114,658 - - - $56,930
-
MMBtu
04 2.2511: Insulate bare equipment $1,752 $3,018 - - - $1,752
-
MMBtu
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $72,779 $121,406 $63,174
1,551,290
kWh
$13,436
-
kW-mo/yr
$(-3,831.0) -
06 2.4133: Use most efficient type of electric motors $8,416 $7,755 $6,593
116,940
kWh
$2,170
-
kW-mo/yr
$(-347.0) -
07 2.4221: Install compressor air intakes in coolest locations $2,329 $607 $1,760
43,083
kWh
$692
-
kW-mo/yr
$(-123.0) -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $22,922 $48,995 $18,418
341,442
kWh
$5,473
-
kW-mo/yr
$(-969.0) -
TOTAL RECOMMENDED $179,459 $298,730 $89,945
2,052,755
kWh
$21,771
-
kW-mo/yr
$(-5,270.0) $73,013
-
MMBtu
TOTAL IMPLEMENTED $16,660 $2,898 $1,760
43,083
kWh
$692
-
kW-mo/yr
$(-123.0) $14,331
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Fuel Oil #6 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs