Assessment Year | 1998 |
---|---|
Principal Product | Lithium Products |
NAICS |
n/a
|
SIC | 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 76 |
Plant Area |
50,740
ft2
|
Annual Production | 13,000,000
lb
|
Production Hrs. Annual | 7,200
hrs
|
Location (State) | Nevada |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $808,985 | 19,846,718 |
kWh
|
$0.041 |
Electricity Demand | $303,918 | 31,778 |
kW-mo/yr
|
$9.56 |
Electricity Fees | $(-47,655.0) | - |
|
- |
LPG | $60,935 | 10,484 |
MMBtu
|
$5.81 |
Fuel Oil #6 | $468,772 | 118,539 |
MMBtu
|
$3.95 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $179,459 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $16,660 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Fuel Oil #6 Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.1213: Direct warmest air to combustion intake | $12,730 | $690 | - | - | - |
$12,730
-
MMBtu
|
|
02 | 2.2136: Install / repair insulation on steam lines | $1,601 | $1,601 | - | - | - |
$1,601
-
MMBtu
|
|
03 | 2.2427: Use waste heat from hot flue gases to preheat incoming fluids | $56,930 | $114,658 | - | - | - |
$56,930
-
MMBtu
|
|
04 | 2.2511: Insulate bare equipment | $1,752 | $3,018 | - | - | - |
$1,752
-
MMBtu
|
|
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $72,779 | $121,406 |
$63,174
1,551,290
kWh
|
$13,436
-
kW-mo/yr
|
$(-3,831.0) | - | |
06 | 2.4133: Use most efficient type of electric motors | $8,416 | $7,755 |
$6,593
116,940
kWh
|
$2,170
-
kW-mo/yr
|
$(-347.0) | - | |
07 | 2.4221: Install compressor air intakes in coolest locations | $2,329 | $607 |
$1,760
43,083
kWh
|
$692
-
kW-mo/yr
|
$(-123.0) | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $22,922 | $48,995 |
$18,418
341,442
kWh
|
$5,473
-
kW-mo/yr
|
$(-969.0) | - | |
TOTAL RECOMMENDED | $179,459 | $298,730 |
$89,945
2,052,755
kWh
|
$21,771
-
kW-mo/yr
|
$(-5,270.0) |
$73,013
-
MMBtu
|
||
TOTAL IMPLEMENTED | $16,660 | $2,898 |
$1,760
43,083
kWh
|
$692
-
kW-mo/yr
|
$(-123.0) |
$14,331
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Fuel Oil #6 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs