ITAC Assessment: TN0635
ITAC logo
ITAC Assessment: TN0635
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Benzoic acid, benzoyl chloride, muriatic acid, benzophenone
NAICS
n/a
SIC 2869: Industrial Organic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 148
Plant Area 400,000
ft2
Annual Production 102,817,716
lb
Production Hrs. Annual 8,736
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $727,508 30,321,806
kWh
Electricity Demand $324,852 46,064
kW-mo/yr
Electricity Fees $78,278 -
Natural Gas $2,421,614 766,525
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $508,670 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $48,780

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings Administrative Changes Savings Ancillary Material Cost Savings Water Consumption Savings
01 2.2121: Increase amount of condensate returned $429,120 $36,880 - $262,120
-
MMBtu
- - - - $167,000
-
Tgal
02 3.6193: Install equipment (eg compactor) to reduce disposal costs $39,020 $13,600 $(-1,500.0)
(-65,064)
kWh
- $20,120
-
lb
- $20,400 - -
03 2.2163: Use minimum steam operating pressure $22,590 $46,880 - $22,590
-
MMBtu
- - - - -
04 2.2136: Install / repair insulation on steam lines $9,760 $3,580 - $9,760
-
MMBtu
- - - - -
05 3.1191: Change procedures / equipment / operating conditions $8,180 - - - - $102,440
-
lb
- $(-94,260.0) -
TOTAL RECOMMENDED $508,670 $100,940 $(-1,500.0)
(-65,064)
kWh
$294,470
-
MMBtu
$20,120
-
lb
$102,440
-
lb
$20,400 $(-94,260.0) $167,000
-
Tgal
TOTAL IMPLEMENTED $48,780 $17,180 $(-1,500.0)
(-65,064)
kWh
$9,760
-
MMBtu
$20,120
-
lb
- $20,400 - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs