Assessment Year | 1998 |
---|---|
Principal Product | Benzoic acid, benzoyl chloride, muriatic acid, benzophenone |
NAICS |
n/a
|
SIC | 2869: Industrial Organic Chemicals, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 148 |
Plant Area |
400,000
ft2
|
Annual Production | 102,817,716
lb
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $727,508 | 30,321,806 |
kWh
|
$0.024 |
Electricity Demand | $324,852 | 46,064 |
kW-mo/yr
|
$7.05 |
Electricity Fees | $78,278 | - |
|
- |
Natural Gas | $2,421,614 | 766,525 |
MMBtu
|
$3.16 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $508,670 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $48,780 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Solid Waste (haz) Savings | Administrative Changes Savings | Ancillary Material Cost Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.2121: Increase amount of condensate returned | $429,120 | $36,880 | - |
$262,120
-
MMBtu
|
- | - | - | - |
$167,000
-
Tgal
|
|
02 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $39,020 | $13,600 |
$(-1,500.0)
(-65,064)
kWh
|
- |
$20,120
-
lb
|
- | $20,400 | - | - | |
03 | 2.2163: Use minimum steam operating pressure | $22,590 | $46,880 | - |
$22,590
-
MMBtu
|
- | - | - | - | - | |
04 | 2.2136: Install / repair insulation on steam lines | $9,760 | $3,580 | - |
$9,760
-
MMBtu
|
- | - | - | - | - | |
05 | 3.1191: Change procedures / equipment / operating conditions | $8,180 | - | - | - | - |
$102,440
-
lb
|
- | $(-94,260.0) | - | |
TOTAL RECOMMENDED | $508,670 | $100,940 |
$(-1,500.0)
(-65,064)
kWh
|
$294,470
-
MMBtu
|
$20,120
-
lb
|
$102,440
-
lb
|
$20,400 | $(-94,260.0) |
$167,000
-
Tgal
|
||
TOTAL IMPLEMENTED | $48,780 | $17,180 |
$(-1,500.0)
(-65,064)
kWh
|
$9,760
-
MMBtu
|
$20,120
-
lb
|
- | $20,400 | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs