ITAC Assessment: CO0422
ITAC logo
ITAC Assessment: CO0422
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product pharmaceuticals
NAICS
n/a
SIC 2834: Pharmaceutical Preparations
Sales Range $1
M
to 5
M
# of Employees 130
Plant Area 51,200
ft2
Annual Production 200,000
pieces
Production Hrs. Annual 2,600
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $41,193 1,466,882
kWh
Electricity Demand $31,980 4,132
kW-mo/yr
Electricity Fees $1,246 -
Natural Gas $11,499 2,385
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $177,104 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $175,840

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings Administrative Changes Savings Primary Product Savings
01 2.8118: Check for accuracy of utility / power meters $5,830 - - - - - $5,830 -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $404 $1,292 $78
4,689
kWh
$326
-
kW-mo/yr
- - - -
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $880 $2,000 - $880
-
kW-mo/yr
- - - -
04 2.7111: Reduce illumination to minimum necessary levels $560 - $240
14,361
kWh
$320
-
kW-mo/yr
- - - -
05 3.5316: Contract a wood pallet recycling company $430 - - - $430
-
lb
- - -
06 3.7198: Reduce / eliminate use of disposable product $430 - - - $430
-
lb
- - -
07 3.6192: Use a less expensive method of waste removal $400 $130 - - - $400
-
lb
- -
08 4.122: Develop standard procedures to improve internal yields $158,670 $50,000 - - - - - $158,670
09 4.131: Modify process to reduce material use/cost $9,500 - - - - - - $9,500
TOTAL RECOMMENDED $177,104 $53,422 $318
19,050
kWh
$1,526
-
kW-mo/yr
$860
-
lb
$400
-
lb
$5,830 $168,170
TOTAL IMPLEMENTED $175,840 $52,130 $240
14,361
kWh
$1,200
-
kW-mo/yr
- $400
-
lb
$5,830 $168,170
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings Administrative Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs