Assessment Year | 1998 |
---|---|
Principal Product | Industrial chemicals |
NAICS |
n/a
|
SIC | 2869: Industrial Organic Chemicals, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 130 |
Plant Area |
50,000
ft2
|
Annual Production | 75,000,000
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $574,046 | 19,800,411 |
kWh
|
$0.029 |
Electricity Demand | $263,860 | 31,600 |
kW-mo/yr
|
$8.35 |
Electricity Fees | $137,119 | - |
|
- |
Fuel Oil #6 | $176,907 | 47,629 |
MMBtu
|
$3.71 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $138,168 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,467 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Fuel Oil #6 Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,467 | $700 | - | - | - |
$3,467
-
MMBtu
|
- | - | |
02 | 4.652: Replace existing equipment with more suitable substitutes | $50,294 | $280,937 |
$21,004
724,502
kWh
|
$8,317
-
kW-mo/yr
|
- | - | - | $20,973 | |
03 | 2.2437: Recover waste heat from equipment | $21,615 | $25,600 |
$(-2,226.0)
(-76,788)
kWh
|
$(-2,595.0)
-
kW-mo/yr
|
$16,310
-
MMBtu
|
$10,126
-
MMBtu
|
- | - | |
04 | 2.5123: Reduce fluid flow rates | $2,040 | $2,500 | - | - | - |
$2,040
-
MMBtu
|
- | - | |
05 | 4.652: Replace existing equipment with more suitable substitutes | $15,191 | $30,000 | - | - | - |
$14,191
-
MMBtu
|
$1,000
-
gal
|
- | |
06 | 4.652: Replace existing equipment with more suitable substitutes | $45,561 | $55,000 |
$567
36,049
kWh
|
$(-3,006.0)
-
kW-mo/yr
|
- | - | - | $48,000 | |
TOTAL RECOMMENDED | $138,168 | $394,737 |
$19,345
683,763
kWh
|
$2,716
-
kW-mo/yr
|
$16,310
-
MMBtu
|
$29,824
-
MMBtu
|
$1,000
-
gal
|
$68,973 | ||
TOTAL IMPLEMENTED | $3,467 | $700 | - | - | - |
$3,467
-
MMBtu
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Fuel Oil #6 Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs