ITAC Assessment: CL2110
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Railroad Products
NAICS 336370: Motor Vehicle Metal Stamping
SIC 3465: Automotive Stampings
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 270,000
ft2
Annual Production 100,000
pieces
Production Hrs. Annual 6,024
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $578,082 9,009,600
kWh
Electricity Demand $1 21,360
kW-mo/yr
Electricity Fees $27,023 -
Natural Gas $3,980 304,826
MMBtu
LPG $28,477 23,135
MMBtu
Waste Disposal Costs
Water Usage $1,990 805
Tgal
Water Disposal $5,888 80,500
Tgal
TOTAL YEARLY COSTS $645,441
RECOMMENDED SAVINGS* $58,250 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $16,493 $18,147 $16,493
257,050
kWh
02 2.7135: Install occupancy sensors $5,721 $4,908 $5,721
95,343
kWh
03 2.7134: Use photocell controls $295 $60 $295
4,599
kWh
04 2.7261: Install timers and/or thermostats $607 - $607
10,113
kWh
05 2.4231: Reduce the pressure of compressed air to the minimum required $5,104 - $5,104
85,069
kWh
06 2.4231: Reduce the pressure of compressed air to the minimum required $22,030 - $22,030
367,162
kWh
07 3.6192: Use a less expensive method of waste removal $8,000 - $8,000
-
kWh
TOTAL RECOMMENDED $58,250 $23,115 $58,250
819,336
kWh
TOTAL IMPLEMENTED - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs