Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,237

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Chemicals and allied products
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UL2505 #03 Y:2025 Recover waste heat from equipment $14,289 $39,000
UL2505 #02 Y:2025 Use solar heat to make electricty $16,332 $130,462
UL2505 #01 Y:2025 Install occupancy sensors $188 $393
CC0044 #03 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $5,283 $9,200
CC0044 #02 Y:2025 Utilize controls to operate equipment only when needed $3,899 $5,000
CC0044 #01 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $19,398 $24,880
SD0673 #12 Y:2025 Install occupancy sensors $5,238 $2,979
SD0673 #11 Y:2025 Use heat pump for space conditioning $33,554 $29,800
SD0673 #10 Y:2025 Replace obsolete burners with more efficient ones $4,061 $10,319
SD0673 #09 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $6,761 $2,117
SD0673 #08 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $5,554 $1,623
SD0673 #07 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $8,439 $6,700
SD0673 #06 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $130,263 $43,658
SD0673 #05 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $259 $339
SD0673 #04 Y:2025 Reduce the pressure of compressed air to the minimum required $6,038 -
SD0673 #03 Y:2025 Utilize higher efficiency lamps and/or ballasts $12,426 $4,882
SD0673 #02 Y:2025 Use battery storage for demand control $652,079 $20,176
SD0673 #01 Y:2025 Use solar heat to make electricty $45,096 $40,868
UF0629 #08 Y:2025 Install compressor air intakes in coolest locations $214 $342
UF0629 #07 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $1,103 $455