ITAC Assessment: CC0044
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Organosilane Monomers, Pharmaceutical Chemicals, Semiconductor Chemicals
NAICS 325199: All Other Basic Organic Chemical Manufacturing
SIC 2869: Industrial Organic Chemicals, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 35
Plant Area 13,887
ft2
Annual Production 75,000
units
Production Hrs. Annual 8,760
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $156,817 3,530,730
kWh
Electricity Demand $108,500 8,222
kW-mo/yr
Electricity Fees $42,810 -
TOTAL YEARLY COSTS $308,126
RECOMMENDED SAVINGS* $28,580 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $19,398 $24,880 $13,708
311,553
kWh
$5,690
-
kW-mo/yr
02 2.6231: Utilize controls to operate equipment only when needed $3,899 $5,000 $3,899
88,609
kWh
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,283 $9,200 $3,058
69,505
kWh
$2,225
-
kW-mo/yr
TOTAL RECOMMENDED $28,580 $39,080 $20,665
469,667
kWh
$7,915
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs