ITAC Assessment: TN0558
ITAC logo
ITAC Assessment: TN0558
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Folded paperboard cartons
NAICS
n/a
SIC 2657: Folding Paperboard Boxes, Including Sanitary
Sales Range $10
M
to 50
M
# of Employees 85
Plant Area 53,000
ft2
Annual Production 266,000,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $62,920 1,273,740
kWh
Natural Gas $19,423 4,096
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $52,328 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,260

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings
01 2.2511: Insulate bare equipment $4,752 $700 - $4,752
-
MMBtu
- -
02 2.7144: Install spectral reflectors / delamp $9,210 $26,368 $9,210
172,333
kWh
- - -
03 2.7144: Install spectral reflectors / delamp $2,003 - $2,003
43,669
kWh
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,526 $885 $1,526
29,015
kWh
- - -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,595 $2,300 $1,595
16,413
kWh
- - -
06 2.2511: Insulate bare equipment $409 $100 $409
12,016
kWh
- - -
07 2.4221: Install compressor air intakes in coolest locations $234 $217 $234
3,224
kWh
- - -
08 3.7124: Install dedicated mixing equip to optimize reuse of used rinseate & to preclude the need for inter-run cleaning $10,267 $200 - - - $10,267
-
lb
09 3.8113: Prevent excessive solvent usage (operator training) $8,084 $5,000 - - $8,084
-
gal
-
10 3.6193: Install equipment (eg compactor) to reduce disposal costs $7,274 $13,600 - - - $7,274
-
lb
11 3.7132: Reuse rags until completely soiled $6,974 - - - - $6,974
-
lb
TOTAL RECOMMENDED $52,328 $49,370 $14,977
276,670
kWh
$4,752
-
MMBtu
$8,084
-
gal
$24,515
-
lb
TOTAL IMPLEMENTED $12,260 $14,517 $234
3,224
kWh
$4,752
-
MMBtu
- $7,274
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs