ITAC Assessment: UF0629
ITAC logo
ITAC Assessment: UF0629
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Active Pharmaceutical Ingredients
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 57,900
ft2
Annual Production 2,425
lb
Production Hrs. Annual 4,080
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $116,037 2,771,720
kWh
Electricity Demand $85,916 5,126
kW-mo/yr
Electricity Fees $29,715 -
TOTAL YEARLY COSTS $231,668
RECOMMENDED SAVINGS* $84,701 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.9114: Use solar heat to make electricty $42,690 $322,608 $26,599
633,319
kWh
$16,091
-
kW-mo/yr
02 2.3191: Use demand controller or load shedder $14,163 $14,913 $8,149
194,020
kWh
$6,014
-
kW-mo/yr
03 2.2622: Replace existing chiller with high efficiency model $14,977 $47,000 $7,797
185,640
kWh
$7,180
-
kW-mo/yr
04 2.6231: Utilize controls to operate equipment only when needed $8,306 $25,400 $8,306
197,756
kWh
-
05 2.2623: Minimize condenser cooling water temperature $1,706 $754 $1,706
40,620
kWh
-
06 2.4239: Eliminate or reduce compressed air usage $1,163 - $1,163
27,693
kWh
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,482 $1,482 $1,482
35,285
kWh
-
08 2.4221: Install compressor air intakes in coolest locations $214 $342 $214
5,099
kWh
-
TOTAL RECOMMENDED $84,701 $412,499 $55,416
1,319,432
kWh
$29,285
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs