| Assessment Year | 2025 |
|---|---|
| Principal Product | Active Pharmaceutical Ingredients |
| NAICS | 325412: Pharmaceutical Preparation Manufacturing |
| SIC | 2834: Pharmaceutical Preparations |
| Sales Range | $10 M to 50M |
| # of Employees | 90 |
| Plant Area |
57,900
ft2
|
| Annual Production | 2,425
lb
|
| Production Hrs. Annual | 4,080
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $116,037 | 2,771,720 |
kWh
|
$0.042 |
| Electricity Demand | $85,916 | 5,126 |
kW-mo/yr
|
$16.76 |
| Electricity Fees | $29,715 | - |
|
- |
| TOTAL YEARLY COSTS | $231,668 | |||
| RECOMMENDED SAVINGS* | $84,322 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.9114: Use solar heat to make electricty | $42,690 | $322,608 |
$26,599
633,319
kWh
|
$16,091
-
kW-mo/yr
|
|
| 02 | 2.3191: Use demand controller or load shedder | $14,163 | $14,913 |
$8,149
194,020
kWh
|
$6,014
-
kW-mo/yr
|
|
| 03 | 2.2622: Replace existing chiller with high efficiency model | $14,977 | $47,000 |
$7,797
185,640
kWh
|
$7,180
-
kW-mo/yr
|
|
| 04 | 2.6231: Utilize controls to operate equipment only when needed | $8,306 | $25,400 |
$8,306
197,756
kWh
|
- | |
| 05 | 2.2623: Minimize condenser cooling water temperature | $1,706 | $754 |
$1,706
40,620
kWh
|
- | |
| 06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,163 | - |
$1,163
27,693
kWh
|
- | |
| 07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,103 | $455 |
$1,103
26,259
kWh
|
- | |
| 08 | 2.4221: Install compressor air intakes in coolest locations | $214 | $342 |
$214
5,099
kWh
|
- | |
| TOTAL RECOMMENDED | $84,322 | $411,472 |
$55,037
1,310,406
kWh
|
$29,285
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs