Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Converted paper and paperboard products, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
BD0459 #11 Y:2015 Recharge batteries on during off-peak demand periods $3,826 $18
BD0459 #10 Y:2015 Use radiant heater for spot heating $1,263 $3,500
BD0459 #09 Y:2015 Lower compressor pressure through a/c system modification $142 $20
BD0459 #08 Y:2015 Install compressor air intakes in coolest locations $377 $800
BD0459 #07 Y:2015 Use / purchase optimum sized compressor $7,002 $30,399
BD0459 #06 Y:2015 Utilize energy-efficient belts and other improved mechanisms $1,004 $300
BD0459 #05 Y:2015 Use most efficient type of electric motors $2,648 $2,700
BD0459 #04 Y:2015 Utilize higher efficiency lamps and/or ballasts $392 $1,300
BD0459 #03 Y:2015 Utilize higher efficiency lamps and/or ballasts $256 $300
BD0459 #02 Y:2015 Install occupancy sensors $1,792 $1,350
BD0459 #01 Y:2015 Utilize higher efficiency lamps and/or ballasts $19,318 $10,000
MO0134 #06 Y:1994 Install compressor air intakes in coolest locations $237 $350
MO0134 #05 Y:1994 Replace electrically-operated equipment with fossil fuel equipment $1,574 $4,266
MO0134 #04 Y:1994 Utilize energy-efficient belts and other improved mechanisms $694 $90
MO0134 #03 Y:1994 Use most efficient type of electric motors $5,895 $5,382
MO0134 #02 Y:1994 Utilize higher efficiency lamps and/or ballasts $3,768 $1,168
MO0134 #01 Y:1994 Utilize higher efficiency lamps and/or ballasts $6,184 $4,474
ND0170 #10 Y:1993 Recover waste heat from equipment $844 $1,200
ND0170 #09 Y:1993 Install compressor air intakes in coolest locations $1,133 $400
ND0170 #08 Y:1993 Install smaller boiler (increase high fire duty cycle) $307 $4,550