ITAC Assessment: UA0287
ITAC logo
ITAC Assessment: UA0287
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Paper Products
NAICS 322299: All Other Converted Paper Product Manufacturing
SIC 2679: Converted Paper and Paperboard Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 200,000
ft2
Annual Production 196,000,000
units
Production Hrs. Annual 4,992
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $246,867 1,617,000
kWh
Electricity Demand $28,995 6,629
kW-mo/yr
Electricity Fees $12,440 -
Natural Gas $5,375 217
MMBtu
Waste Disposal Costs
Water Usage $564 55
Tgal
TOTAL YEARLY COSTS $294,241
RECOMMENDED SAVINGS* $132,561 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7135: Install occupancy sensors $6,007 $1,191 $5,748
37,643
kWh
- $259 -
02 2.7261: Install timers and/or thermostats $300 $108 $287
1,880
kWh
- $13 -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $64 $183 $52
345
kWh
$9
-
kW-mo/yr
$3 -
04 2.4231: Reduce the pressure of compressed air to the minimum required $6,926 $1,000 $6,028
39,477
kWh
$599
-
kW-mo/yr
$299 -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $25,986 $8,591 $23,078
151,136
kWh
$1,787
-
kW-mo/yr
$1,121 -
06 2.2437: Recover waste heat from equipment $5,375 $8,397 - - - $5,375
-
MMBtu
07 2.9114: Use solar heat to make electricty $87,903 $414,460 $83,061
543,950
kWh
$1,049
-
kW-mo/yr
$3,793 -
TOTAL RECOMMENDED $132,561 $433,930 $118,254
774,431
kWh
$3,444
-
kW-mo/yr
$5,488 $5,375
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs