Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

642

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Packaging paper and plastics film, coated and laminated
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AS0604 #07 Y:2025 Install occupancy sensors $215 $315
AS0604 #06 Y:2025 Install spectral reflectors / delamp $559 $17
AS0604 #05 Y:2025 Install timers on light switches in little used areas $834 $1,268
AS0604 #04 Y:2025 Install compressor air intakes in coolest locations $869 $3,646
AS0604 #03 Y:2025 Utilize higher efficiency lamps and/or ballasts $1,851 $2,568
AS0604 #02 Y:2025 Reschedule plant operations or reduce load to avoid peaks $28,514 $46,000
AS0604 #01 Y:2025 Use solar heat to make electricty $83,160 $515,135
NT0040 #05 Y:2024 Apply for investment incentives $3,165 $5,000
NT0040 #04 Y:2024 Optimize plant power factor $6,649 $5,965
NT0040 #03 Y:2024 Train operators for maximum operating efficiency $150,000 $12,000
NT0040 #02 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $2,568 $5,609
NT0040 #01 Y:2024 Reduce the pressure of compressed air to the minimum required $1,238 -
CI0043 #08 Y:2024 Recharge batteries on during off-peak demand periods $2,248 $800
CI0043 #07 Y:2024 Use photocell controls $2,912 $8,100
CI0043 #06 Y:2024 Use most efficient type of electric motors $3,043 $1,380
CI0043 #05 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $8,106 $23,794
CI0043 #04 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $14,483 $12,000
CI0043 #03 Y:2024 Install occupancy sensors $18,838 $12,100
CI0043 #02 Y:2024 Utilize higher efficiency lamps and/or ballasts $18,970 $7,350
CI0043 #01 Y:2024 Use optimum size and capacity equipment $143,742 $300,000