Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

622

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Packaging paper and plastics film, coated and laminated
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IC0314 #11 Y:2024 Use or replace with energy efficient substitutes $4,325 $48,415
IC0314 #10 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $17,150 $4,200
IC0314 #09 Y:2024 Install compressor air intakes in coolest locations $4,295 $652
IC0314 #08 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $1,286 $160
IC0314 #07 Y:2024 Replace existing hvac unit with high efficiency model $3,800 $30,177
IC0314 #06 Y:2024 Eliminate or reduce compressed air usage $2,212 $376
IC0314 #05 Y:2024 Lower temperature during the winter season and vice-versa $3,076 -
IC0314 #04 Y:2024 Eliminate or reduce compressed air usage $6,527 -
IC0314 #03 Y:2024 Utilize higher efficiency lamps and/or ballasts $1,007 $683
IC0314 #02 Y:2024 Install an uninteruptable power supply $48,560 $367,354
IC0314 #01 Y:2024 Use solar heat to make electricty $79,445 $420,971
UL2306 #05 Y:2023 Optimize plant power factor $103,804 $14,859
UL2306 #04 Y:2023 Use solar heat to make electricty $30,055 $314,019
UL2306 #03 Y:2023 Size electric motors for peak operating efficiency $8,595 $12,891
UL2306 #02 Y:2023 Lower temperature during the winter season and vice-versa $336 $600
UL2306 #01 Y:2023 Install occupancy sensors $1,019 -
CC0018 #06 Y:2023 Replace fossil fuel equipment with electrical equipment $95,279 $350,000
CC0018 #05 Y:2023 Use cooling tower water instead of refrigeration $16,265 $70,000
CC0018 #04 Y:2023 Reduce the pressure of compressed air to the minimum required $2,300 -
CC0018 #03 Y:2023 Eliminate or reduce compressed air usage $5,158 $10,000