ITAC Assessment: IP0209
ITAC logo
ITAC Assessment: IP0209
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Printed Food Packaging
NAICS 326111: Plastics Bag and Pouch Manufacturing
SIC 2671: Packaging Paper and Plastics Film, Coated and Laminated
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 266,900
ft2
Annual Production 13,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $478,447 10,074,688
kWh
Electricity Demand $401,762 24,617
kW-mo/yr
Electricity Fees $1,898 -
Natural Gas $196,058 57,272
MMBtu
Waste Disposal Costs
Water Usage $34,877 6,575
Tgal
Water Disposal $29,546 6,248
Tgal
TOTAL YEARLY COSTS $1,142,588
RECOMMENDED SAVINGS* $43,701 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7224: Reduce space conditioning during non-working hours $11,808 - $6,421
135,182
kWh
- $5,387
-
MMBtu
02 2.4224: Upgrade controls on compressors $4,072 - $2,055
43,260
kWh
$2,017
-
kW-mo/yr
-
03 2.2625: Chill water to the highest temperature possible $910 - $910
19,167
kWh
- -
04 2.7241: Install outside air damper / economizer on hvac unit $336 - $336
7,080
kWh
- -
05 2.7141: Lower light fixtures in high ceiling areas $9,829 $238 $6,593
138,802
kWh
$3,236
-
kW-mo/yr
-
06 2.1123: Install automatic stack damper $9,546 $1,395 $8,077
170,040
kWh
$1,469
-
kW-mo/yr
-
07 2.4231: Reduce the pressure of compressed air to the minimum required $7,200 $1,306 $4,687
98,673
kWh
$2,513
-
kW-mo/yr
-
TOTAL RECOMMENDED $43,701 $2,939 $29,079
612,204
kWh
$9,235
-
kW-mo/yr
$5,387
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs