ITAC Assessment: WI0290
ITAC logo
ITAC Assessment: WI0290
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Home Furnishings
NAICS
n/a
SIC 3645: Residential Electric Lighting Fixtures
Sales Range $10
M
to 50
M
# of Employees 530
Plant Area 454,900
ft2
Annual Production 375,000
pieces
Production Hrs. Annual 3,000
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $114,287 2,758,499
kWh
Electricity Demand $168,128 12,053
kW-mo/yr
Electricity Fees $17,026 -
Natural Gas $187,744 51,283
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $173,533 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $142,548

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (haz) Savings Personnel Changes Savings Primary Raw Material Savings
01 3.2123: Convert to high volume low pressure (hvlp) paint guns $119,620 $15,000 - - - - - $119,620
02 2.7314: Reduce ventilation air $10,493 $15,000 $1,504
34,584
kWh
- $8,989
-
MMBtu
- - -
03 3.6193: Install equipment (eg compactor) to reduce disposal costs $7,560 $5,000 - - - $7,560
-
lb
- -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $10,200 $15,000 $7,904
181,419
kWh
$9,856
-
kW-mo/yr
$(-7,560.0)
-
MMBtu
- - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,755 $330 $3,857
88,511
kWh
$3,898
-
kW-mo/yr
- - - -
06 2.4221: Install compressor air intakes in coolest locations $1,526 $1,380 $522
12,016
kWh
$1,004
-
kW-mo/yr
- - - -
07 2.3131: Reschedule plant operations or reduce load to avoid peaks $7,982 - - $8,332
-
kW-mo/yr
- - $(-350.0) -
08 2.1233: Analyze flue gas for proper air/fuel ratio $5,333 $500 - - $5,333
-
MMBtu
- - -
09 2.7447: Install vinyl strip / high speed / air curtain doors $2,280 $1,120 - - $2,280
-
MMBtu
- - -
10 4.321: Optimize production lot sizes and inventories $784 - - - - - - $784
TOTAL RECOMMENDED $173,533 $53,330 $13,787
316,530
kWh
$23,090
-
kW-mo/yr
$9,042
-
MMBtu
$7,560
-
lb
$(-350.0) $120,404
TOTAL IMPLEMENTED $142,548 $21,950 $3,857
88,511
kWh
$3,898
-
kW-mo/yr
$7,613
-
MMBtu
$7,560
-
lb
- $119,620
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (haz) Savings Personnel Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs