| Assessment Year | 2025 |
|---|---|
| Principal Product | Flexible Packaging |
| NAICS | 326199: All Other Plastics Product Manufacturing |
| SIC | 2671: Packaging Paper and Plastics Film, Coated and Laminated |
| Sales Range | $50 M to 100M |
| # of Employees | 110 |
| Plant Area |
113,500
ft2
|
| Annual Production | 13,000,000
lb
|
| Production Hrs. Annual | 4,752
hrs
|
| Location (State) | Arizona |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $444,245 | 6,538,546 |
kWh
|
$0.068 | |
| Electricity Demand | $378,664 | 20,554 |
kW-mo/yr
|
$18.42 | |
| Electricity Fees | $59,545 | - |
|
- | |
| Natural Gas | $289,602 | 38,775 |
MMBtu
|
$7.47 | |
| Other Energy | $39,979 | 1 |
MMBtu
|
$39,979.00 | |
| Waste Disposal Costs | |||||
| Water Usage | $3,910 | 535 |
Tgal
|
$7.31 | |
| TOTAL YEARLY COSTS | $1,215,945 | ||||
| RECOMMENDED SAVINGS* | $116,002 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.9114: Use solar heat to make electricty | $83,160 | $515,135 |
$54,860
807,957
kWh
|
$28,300
-
kW-mo/yr
|
- | |
| 02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $28,514 | $46,000 | - |
$28,514
-
kW-mo/yr
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,851 | $2,568 |
$926
13,655
kWh
|
$635
-
kW-mo/yr
|
$290 | |
| 04 | 2.4221: Install compressor air intakes in coolest locations | $869 | $3,646 |
$670
9,869
kWh
|
$199
-
kW-mo/yr
|
- | |
| 05 | 2.7132: Install timers on light switches in little used areas | $834 | $1,268 |
$834
12,276
kWh
|
- | - | |
| 06 | 2.7144: Install spectral reflectors / delamp | $559 | $17 |
$290
4,257
kWh
|
$101
-
kW-mo/yr
|
$168 | |
| 07 | 2.7135: Install occupancy sensors | $215 | $315 |
$128
1,881
kWh
|
$87
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $116,002 | $568,949 |
$57,708
849,895
kWh
|
$57,836
-
kW-mo/yr
|
$458 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs