Assessment Year | 2025 |
---|---|
Principal Product | Flexible Packaging |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 2671: Packaging Paper and Plastics Film, Coated and Laminated |
Sales Range | $50 M to 100M |
# of Employees | 110 |
Plant Area |
113,500
ft2
|
Annual Production | 13,000,000
lb
|
Production Hrs. Annual | 4,752
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $444,245 | 6,538,546 |
kWh
|
$0.068 | |
Electricity Demand | $378,664 | 20,554 |
kW-mo/yr
|
$18.42 | |
Electricity Fees | $59,545 | - |
|
- | |
Natural Gas | $289,602 | 38,775 |
MMBtu
|
$7.47 | |
Other Energy | $39,979 | 1 |
MMBtu
|
$39,979.00 | |
Waste Disposal Costs | |||||
Water Usage | $3,910 | 535 |
Tgal
|
$7.31 | |
TOTAL YEARLY COSTS | $1,215,945 | ||||
RECOMMENDED SAVINGS* | $116,002 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $83,160 | $515,135 |
$54,860
807,957
kWh
|
$28,300
-
kW-mo/yr
|
- | |
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $28,514 | $46,000 | - |
$28,514
-
kW-mo/yr
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,851 | $2,568 |
$926
13,655
kWh
|
$635
-
kW-mo/yr
|
$290 | |
04 | 2.4221: Install compressor air intakes in coolest locations | $869 | $3,646 |
$670
9,869
kWh
|
$199
-
kW-mo/yr
|
- | |
05 | 2.7132: Install timers on light switches in little used areas | $834 | $1,268 |
$834
12,276
kWh
|
- | - | |
06 | 2.7144: Install spectral reflectors / delamp | $559 | $17 |
$290
4,257
kWh
|
$101
-
kW-mo/yr
|
$168 | |
07 | 2.7135: Install occupancy sensors | $215 | $315 |
$128
1,881
kWh
|
$87
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $116,002 | $568,949 |
$57,708
849,895
kWh
|
$57,836
-
kW-mo/yr
|
$458 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs