ITAC Assessment: SF0354
ITAC logo
ITAC Assessment: SF0354
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Bottled Wines
NAICS 312130: Wineries
SIC 2084: Wines, Brandy, and Brandy Spirits
Sales Range $5
M
to 10
M
# of Employees 65
Plant Area 65,000
ft2
Annual Production 36,000
units
Production Hrs. Annual 3,302
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $150,644 1,227,454
kWh
Electricity Demand $31,218 3,846
kW-mo/yr
Electricity Fees $3,960 -
Natural Gas $47,066 4,354
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,204 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,272

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $2,405 $150 $1,956
15,861
kWh
$449
-
kW-mo/yr
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,867 $1,654 $4,630
37,556
kWh
$237
-
kW-mo/yr
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,475 $1,441 $1,238
10,046
kWh
$237
-
kW-mo/yr
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $411 $498 $387
3,136
kWh
$24
-
kW-mo/yr
05 2.4133: Use most efficient type of electric motors $540 $732 $474
3,841
kWh
$66
-
kW-mo/yr
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $535 $1,706 $535
4,343
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $3,475 $12,187 $2,820
22,875
kWh
$655
-
kW-mo/yr
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $496 $2,215 $485
3,938
kWh
$11
-
kW-mo/yr
TOTAL RECOMMENDED $14,204 $20,583 $12,525
101,596
kWh
$1,679
-
kW-mo/yr
TOTAL IMPLEMENTED $7,272 $1,804 $6,586
53,417
kWh
$686
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs