ITAC Assessment: WM0145
ITAC logo
ITAC Assessment: WM0145
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Kitchen and Lavatory Faucets
NAICS 332913: Plumbing Fixture Fitting and Trim Manufacturing
SIC 3432: Plumbing Fixture Fittings and Trim
Sales Range $100
M
to 500
M
# of Employees 75
Plant Area 132,308
ft2
Annual Production 4,964,000
lb
Production Hrs. Annual 7,056
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $628,832 8,169,929
kWh
Natural Gas $104,120 26,461
MMBtu
Waste Disposal Costs
Water Usage $4,308 1,213
Tgal
TOTAL YEARLY COSTS $737,260
RECOMMENDED SAVINGS* $60,166 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,002

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1122: Re-size charging openings or add a movable door on equipment $29,234 $3,500 $29,234
381,546
kWh
-
02 3.1223: Use fog nozzles / spray rinsing instead of immersion rinsing $10,866 $8,300 $10,866
141,120
kWh
-
03 2.1131: Repair faulty insulation in furnaces, boilers, etc $7,173 $2,200 $7,173
93,151
kWh
-
04 2.7447: Install vinyl strip / high speed / air curtain doors $3,925 $2,210 - $3,925
-
MMBtu
05 2.6218: Turn off equipment when not in use $3,800 $1,040 $3,800
49,348
kWh
-
06 2.7444: Close holes and openings in building such as broken windows $2,032 $771 - $2,032
-
MMBtu
07 2.7142: Utilize higher efficiency lamps and/or ballasts $2,002 $3,768 $2,002
26,001
kWh
-
08 2.6241: Reduce temperature of process equipment when on standby $1,134 - $1,134
14,722
kWh
-
TOTAL RECOMMENDED $60,166 $21,789 $54,209
705,888
kWh
$5,957
-
MMBtu
TOTAL IMPLEMENTED $2,002 $3,768 $2,002
26,001
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs