ITAC Assessment: WV0470
ITAC logo
ITAC Assessment: WV0470
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product leak proof vessels
NAICS 331110: Iron and Steel Mills and Ferroalloy Manufacturing
SIC 3444: Sheet Metal Work
Sales Range $10
M
to 50
M
# of Employees 133
Plant Area 200,000
ft2
Annual Production 750,000
ton
Production Hrs. Annual 6,240
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $476,682 7,249,285
kWh
Electricity Demand $66,721 19,097
kW-mo/yr
Electricity Fees $46,200 -
Natural Gas $200,415 41,289
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $65,041 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $51,768

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.4322: Use or replace with energy efficient substitutes $24,095 $2,500 - - $24,095
-
MMBtu
-
02 2.1122: Re-size charging openings or add a movable door on equipment $16,582 $68,000 - - $16,582
-
MMBtu
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,807 $20,200 $6,179
93,903
kWh
$628
-
kW-mo/yr
- -
04 2.2437: Recover waste heat from equipment $4,666 $1,080 - - $4,666
-
MMBtu
-
05 2.2414: Use waste heat from hot flue gases to preheat $4,422 $13,020 $(-173.0)
(-2,635)
kWh
$(-17.0)
-
kW-mo/yr
$4,612
-
MMBtu
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $3,069 $2,050 $2,786
42,342
kWh
$283
-
kW-mo/yr
- -
07 2.1233: Analyze flue gas for proper air/fuel ratio $2,736 $1,700 - - $2,871
-
MMBtu
$(-135.0)
08 2.4239: Eliminate or reduce compressed air usage $1,892 $3,300 $1,717
26,087
kWh
$175
-
kW-mo/yr
- -
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $620 $105 $564
8,565
kWh
$56
-
kW-mo/yr
- -
10 2.4151: Develop a repair/replace policy $152 $380 $301
4,581
kWh
$31
-
kW-mo/yr
- $(-180.0)
TOTAL RECOMMENDED $65,041 $112,335 $11,374
172,843
kWh
$1,156
-
kW-mo/yr
$52,826
-
MMBtu
$(-315.0)
TOTAL IMPLEMENTED $51,768 $75,435 $3,350
50,907
kWh
$339
-
kW-mo/yr
$48,214
-
MMBtu
$(-135.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs