ITAC Assessment: WI0270
ITAC logo
ITAC Assessment: WI0270
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Industrial Brushes
NAICS
n/a
SIC 3991: Brooms and Brushes
Sales Range $5
M
to 10
M
# of Employees 80
Plant Area 60,000
ft2
Annual Production 8,000,000
pieces
Production Hrs. Annual 4,250
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $25,021 401,817
kWh
Electricity Demand $11,313 1,293
kW-mo/yr
Electricity Fees $234 -
Natural Gas $15,481 3,439
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,833 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,653

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.7261: Install timers and/or thermostats $2,808 $600 - - - $2,808
-
MMBtu
-
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,948 $2,800 $1,152
37,808
kWh
$2,182
-
kW-mo/yr
- $(-1,386.0)
-
MMBtu
-
03 2.7243: Improve air circulation with destratification fans / other methods $1,559 $1,550 $(-44.0)
(-1,465)
kWh
- - $1,603
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,194 $1,800 $636
20,809
kWh
$558
-
kW-mo/yr
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $156 $383 - $156
-
kW-mo/yr
- - -
06 2.1132: Repair faulty louvers and dampers $964 $1,100 - - - $964
-
MMBtu
-
07 3.5242: Recover metals from spent solutions and recycle $590 - - - - - $590
-
lb
08 2.8121: Apply for tax-free status for energy purchases $342 - - - $342 - -
09 3.5217: Reuse / recycle/ sell paper products $180 - - - - - $180
-
lb
10 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $92 - $92
2,931
kWh
- - - -
TOTAL RECOMMENDED $9,833 $8,233 $1,836
60,083
kWh
$2,896
-
kW-mo/yr
$342 $3,989
-
MMBtu
$770
-
lb
TOTAL IMPLEMENTED $5,653 $3,950 $684
22,275
kWh
$558
-
kW-mo/yr
- $4,411
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs