Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

629

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Folding paperboard boxes, including sanitary
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LE0512 #05 Y:2021 Use or replace with energy efficient substitutes $460,500 $3,500,000
LE0512 #04 Y:2021 Utilize higher efficiency lamps and/or ballasts $2,146 $7,700
LE0512 #03 Y:2021 Reduce the pressure of compressed air to the minimum required $1,086 $1,700
LE0512 #02 Y:2021 Use or replace with energy efficient substitutes $2,168 $4,000
LE0512 #01 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $3,383 $4,000
NL0026 #04 Y:2018 Reduce the pressure of compressed air to the minimum required $450 -
NL0026 #03 Y:2018 Eliminate leaks in inert gas and compressed air lines/ valves $450 $1,000
NL0026 #02 Y:2018 Utilize higher efficiency lamps and/or ballasts $19,570 $69,390
NL0026 #01 Y:2018 Improve air circulation with destratification fans / other methods $28,240 $65,000
AM0764 #09 Y:2018 Make a practice of turning off lights when not needed $340 $130
AM0764 #08 Y:2018 Reduce the pressure of compressed air to the minimum required $450 $8
AM0764 #07 Y:2018 Pay utility bills on time $715 -
AM0764 #06 Y:2018 Utilize daylight whenever possible in lieu of artificial light $720 $8
AM0764 #05 Y:2018 Utilize higher efficiency lamps and/or ballasts $820 $1,390
AM0764 #04 Y:2018 Eliminate leaks in inert gas and compressed air lines/ valves $2,310 $1,000
AM0764 #03 Y:2018 Optimize plant power factor $3,725 $7,170
AM0764 #02 Y:2018 Apply for tax-free status for energy purchases $20,080 $7,000
AM0764 #01 Y:2018 Use evaporation to concentrate material $13,350 $7,000
OR0688 #04 Y:2017 Eliminate leaks in inert gas and compressed air lines/ valves $21,165 -
OR0688 #03 Y:2017 Use adjustable frequency drive or multiple speed motors on existing system $3,049 -